Skip to main content

BOMAG puts in a lap at Mandalika race track

Set on the tranquil Indonesian tourist island of Lombok, the Mandalika Street Circuit is set to become one of the most exciting tracks in the international motorcycle racing calendar.
November 23, 2021

The new MotoGP circuit for motorcycles is basically a street course but designed so that part of it is closed to public traffic during race weekends. The surface of a racetrack is crucial for the grip and tyre wear of the motorcycles. Therefore, the track surface must meet the highest standards.

BOMAG paving and compaction equipment was selected to install the asphalt elements of the track.

For paving the asphalt course layers, two BOMAG BF 800 C pavers where used. The compaction was done by 10 tonne BOMAG tandem rollers BW 161 AD-4 and pneumatic tyre rollers type BW 24 RH.

Exhibitions

For more information on companies in this article

Related Content

  • Choosing the right modified bitumen made easier
    February 10, 2012
    Choosing the correct high performance binder material for use in asphalt applications has been made easier following a product rebranding exercise by one company. Awareness among highway maintenance contractors of the benefits of selecting polymer modified bitumens when specifying road surfacing materials has risen markedly in the last few years.
  • Fast flyover removal with specialist demolition equipment
    July 12, 2012
    An overcrowded Indian flyover was removed in record time using specialist demolition equipment, as Patrick Smith reports Demolition of the landmark Lalbaug flyover south of central Mumbai has been completed and work on a new bigger bridge has started in India's largest city. Although the 38-year-old Sant Dnyaneshwar (Lalbaug flyover) two-lane, one-way traffic artery was serviceable and used by to 15,000 vehicles/hour, there were daily traffic jams and environmental consequences. Despite the complex and dema
  • Controlling influence
    January 3, 2013
    New lane control solutions from major roadmarking companies have been installed on highways across the world over recent months. Guy Woodford reports on some of them. Clearview Traffic Group (CTG) recently clocked up the installation of over 70,000 Astucia active flush and surface mounted road studs in the UK. CTG has been involved in numerous road stud installation projects on motorways and other road types in the UK and many other countries worldwide. Its UK installations include over 4,500 Astucia road s
  • How waste plastic and soybean oil are helping our roads last longer
    April 13, 2018
    A clear polymer-modified binder (PMB) combined with carefully selected aggregates has helped restore an ageing promenade in Morecambe, a popular seaside resort on the West coast of Northern England. As part of a £10 million project to upgrade the seawall in the town, Lancaster City Council procured a new promenade as the existing one had suffered from longitudinal cracking. Given Morecambe’s important tourist industry, aesthetics – as well as longevity – were an important consideration. Contractor VBA work