Skip to main content

BOMAG puts in a lap at Mandalika race track

Set on the tranquil Indonesian tourist island of Lombok, the Mandalika Street Circuit is set to become one of the most exciting tracks in the international motorcycle racing calendar.
November 23, 2021

The new MotoGP circuit for motorcycles is basically a street course but designed so that part of it is closed to public traffic during race weekends. The surface of a racetrack is crucial for the grip and tyre wear of the motorcycles. Therefore, the track surface must meet the highest standards.

BOMAG paving and compaction equipment was selected to install the asphalt elements of the track.

For paving the asphalt course layers, two BOMAG BF 800 C pavers where used. The compaction was done by 10 tonne BOMAG tandem rollers BW 161 AD-4 and pneumatic tyre rollers type BW 24 RH.

Exhibitions

For more information on companies in this article

Related Content

  • New asphalt compaction technologies boost quality
    February 28, 2012
    More sophisticated compaction technologies are now coming to market, offering a wide range of benefits to users
  • BOMAG’s new asphalt paver range
    June 23, 2021
    BOMAG is launching its new range of asphalt pavers, which benefit from the latest technology. The new generation of universal and highway class pavers from BOMAG are equipped with the company’s Advanced Pave system, a digital co-pilot for pavers
  • Asphalt paver proven in tough applications
    February 16, 2012
    BOMAG says that its new BF800 paver has now been well proven in tough working applications.
  • Asphalt paver proven in tough applications
    April 10, 2012
    BOMAG says that its new BF800 paver has now been well proven in tough working applications. The newly developed BF800 follows the same basic design principles of the smaller BF300 and BF600 models and weighs in at 20tonnes, with a maximum screed width of 2.5-10m. Extensive testing of the BF800 was carried out in an array of difficult operations and in late 2010 some 14,000tonnes of asphalt was laid in 3.5 days in 24-hour shifts to reconstruct the Brenner highway on the A22 near Bozen in northern Italy.