Skip to main content

Bell rings for heavy construction

January 6, 2017
A 50-tonne prototype dump truck is the centrepiece of Bell’s impressive stand at INTERMAT 2015 and offers a real glimpse of the heavy construction industry’s future.
Exhibitions

Related Content

  • Rapidmix enables re-use of waste fines for Gallagher Group
    May 23, 2016
    Rapid International has supplied the Gallagher Group, based in the UK, with a new Rapidmix 400CW mobile continuous mixing plant. The Rapidmix machine is operated primarily at the group’s Hermitage Quarry site and is transported to site if haulage presents an issue. Gallagher Group, in the south-east county of Kent, is a building, civil engineering, aggregates and property development company. The group has already purchased a 3m3 Rapid pan mixer for installation in a concrete batching plant system.
  • Rapidmix enables re-use of waste fines for Gallagher Group
    May 23, 2016
    Rapid International has supplied the Gallagher Group, based in the UK, with a new Rapidmix 400CW mobile continuous mixing plant. The Rapidmix machine is operated primarily at the group’s Hermitage Quarry site and is transported to site if haulage presents an issue. Gallagher Group, in the south-east county of Kent, is a building, civil engineering, aggregates and property development company. The group has already purchased a 3m3 Rapid pan mixer for installation in a concrete batching plant system.
  • High performing compact loaders from Kubota and Volvo CE
    April 12, 2018
    The competitive market for compact loaders is seeing new additions Kubota, SDLG and Volvo CE are now offering compact wheeled loaders that deliver more power and performance than earlier generation models. These compact wheeled loaders are intended to carry out a wide range of tasks and can be used for truck loading or stocking purposes, as well as an array of other duties. Tight turning circles mean that the machines are able to operate on small sites, while the units have long wheelbases for their ove
  • Heavy going for heavy loads in Canada’s Alberta province
    January 9, 2019
    Canada’s Alberta province is considering a US$1.2 billion upgrade to its High Load Corridor that recently saw transportation of an 820 tonne petrochemical pipe. The 96m long tower – equivalent to a football pitch in length and about two lanes wide - was made in the capital city Edmonton, loaded onto a special trucking unit and driven the 38km to Fort Saskatchewan, mostly along provincial Highway 14 and then 21. The journey took four days and the tower, a polypropylene-propane splitter - will be instal