On Day 3 of bauma 2019 dark skies did not reflect the mood of the visitors who flocked to the show. The Daily News team caught up with some of them and also got an insight into some of the latest technology including a remotely controlled truck
Hillhead 2012, the three-day biennial flagship event for the quarrying, recycling and heavy construction industries, is set to be a sell-out. Guy Woodford looks at what a number of major companies will be exhibiting during the show being held next month at Buxton Quarry in Derbyshire With 400 exhibitors already confirmed Hillhead 2012, taking place 19-21 June, is set to draw bumper crowds and provide crucial new business opportunities for companies involved in quarrying, recycling and heavy construction. Ca
In this, the third roundtable meeting in World Highways’ series of Connected Construction discussions, Guy Woodford discusses the implications of developments in artificial intelligence (AI) and machine control with world-class experts in their field. Find out what Elwyn McLachlan, vice president of Civil Solutions at Trimble, Murray Lodge, senior vice president and general manager of Construction at Topcon Positioning Group, and Magnus Thibblin, vice president Heavy Construction at Hexagon Geosystems have to say about how you should be positioning your company for a successful future.
High speed, high quality concrete paving can be achieved in the demanding airport environment using the latest equipment. Minnich Manufacturing has developed a novel dowel pin drilling machine and has successfully tested this equipment at Tyndall Air Force Base in Panama City, Florida. The A-5SCW is a self-propelled, cantilevered machine that features a wireless remote control and is designed to install five dowel pins simultaneously. The control system has been developed by Wisconsin Kar-Tech and uses prov
In November 2012, the new Circuit of the Americas (COTA) in Austin, Texas, hosted the first ever Formula 1 US Grand Prix on a purpose-built track. But, as Jeff Winke and Guy Woodford report, the construction of COTA was just as demanding as competing in an F1 race itself For COTA construction contractor Austin Bridge & Road, L.P., nothing was more vital to the successful building of the 5.5km F1 track than meeting the strict criteria for its asphalt-paved surface. “The amount of stress this pavement will un