Skip to main content

bauma 2019 Day 1

April 5, 2019
Day 1 at bauma 2019: LiuGong goes high tech
Exhibitions

Related Content

  • Improved piling rigs from Soilmec at bauma 2022
    October 26, 2022
    Soilmec is offering improved performance for its latest SR piling rigs. These new Blue Tech models offer increased productivity and versatility, reducing operating costs and emissions as well as ergonomics and safety onsite.
  • New emission compliant dozers are offered by Dressta
    January 6, 2017
    Dressta is now offering versions of its well-proven bulldozer range equipped with Tier 4 Interim/Stage IIIB emission compliant engines. The TD-25, TD-20, TD-15 and TD-14 class dozers will all be available with Tier 4 Interim/Stage IIIB emission rated diesels during 2013. The company says that its TD-10, TD-9, TD-8 and TD-7 bulldozers will be available with Tier 4 Interim/Stage IIIB engines in 2014, while these models will also be revamped with new hydrostatic drivelines. The TD-40 and TD-25 will remain avai
  • New emission compliant dozers are offered by Dressta
    February 7, 2013
    Dressta is now offering versions of its well-proven bulldozer range equipped with Tier 4 Interim/Stage IIIB emission compliant engines. The TD-25, TD-20, TD-15 and TD-14 class dozers will all be available with Tier 4 Interim/Stage IIIB emission rated diesels during 2013. The company says that its TD-10, TD-9, TD-8 and TD-7 bulldozers will be available with Tier 4 Interim/Stage IIIB engines in 2014, while these models will also be revamped with new hydrostatic drivelines. The TD-40 and TD-25 will remain avai
  • Record bursting water repairs
    June 13, 2012
    Vital repairs to a drinking water transport pipeline in Norway included the first ever use in the country of trenchless water pipe bursting to fix damaged cast-iron pipes. Leaks caused by corrosion had become commonplace over 900m of the 40-year-old ND 600 cast iron-made pipeline in Trondheim. Due to the pipeline running 3m below a busy street and in front of a kindergarten and school, contracted civil engineering firm Sandum decided to replace the pipeline using a trenchless pipe bursting method rather tha