Skip to main content

Asphalt road construction made easy with Bomag

July 3, 2024

With the software solution from Bomag, construction managers can significantly simplify the planning effort for an upcoming road construction project... content originally published by BOMAG worldwide: https://www.youtube.com/watch?v=V2Xt_meUJz8

Content produced in association with Bomag

Exhibitions

For more information on companies in this article

Related Content

  • Connect the Physical and Virtual World to Better Plan, Design, Construct, and Operate Your Road Networks
    January 12, 2023
    Many bridges and roads around the world are in poor condition due to age, wear and tear, and environmental factors, requiring repair or even replacement. To make our roads and bridges safer, transportation agencies must prioritize strategic investments to improve and preserve roadway conditions, as well as plan for constructing new roadways.
  • Snow removal: a right way and a wrong way
    June 12, 2015
    Snow. That winter menace for road users. Often it catches drivers unaware; often its efficient removal is planned for by road authorities. Some regions and countries get more snow than others, such as Scandinavia, northern Europe and North America, and are better at it.
  • Video: Chinese cars levitate at crossroads
    December 23, 2015
    Watch as the vehicles appear to be grabbed by some invisible power, tossed around and chucked backwards up in the air. Startled onlookers stare at the van drivers struggle to get out of their cabs.
  • New Bocimi Toll Road Aims to Reduce Travel Time and Boost Indonesia’s Economy
    April 20, 2023
    The Bogor-Ciawi-Sukabumi (Bocimi) toll road is a series of national strategic projects to help reduce traffic congestion along the existing factory-lined roadway, as well as enhance regional connectivity and tourism in West Java. Spanning 54 kilometers, the new highway corridor is expected to shorten travel time between the Bogor and Sukabumi provinces from two hours to 30 minutes and boost economic conditions in the surrounding Sukabumi area. Construction is divided into four phases, the first of which measures 15.35 kilometers and is already complete. PT Waskita Karya (Waskita) is the main contractor for the IDR 2.1 trillion second section, spanning 11.9 kilometers between Cigombong and Cibadak, and set for completion in 2023 after being delayed due to the pandemic.