Skip to main content

Ammann unveils containerised QuickBatch mobile asphalt mixing plant

April 22, 2015
In response to customer demand, Ammann has developed a new QuickBatch 180 containerised mobile asphalt mixing plant that is easy to transport and quick to set up. It uses a simple “plug and play” electric system.
Exhibitions

Related Content

  • Günter Papenburg’s versatile asphalt plants
    March 2, 2016
    Günter Papenburg is now offering a range of highly versatile and mobile asphalt batching plants. These plants are designed for ease of transportation as they come in standard shipping containers and can be set up in just 1-2 weeks on site according to the firm. The firm’s Rapid plants are available in two basic variants, with outputs of 140tonnes/hour and 180tonnes/hour. Customers can also specify from a range of options including hot storage or different hopper configurations. The plants can be supplied wi
  • Günter Papenburg’s versatile asphalt plants
    January 6, 2017
    Günter Papenburg is now offering a range of highly versatile and mobile asphalt batching plants. These plants are designed for ease of transportation as they come in standard shipping containers and can be set up in just 1-2 weeks on site according to the firm. The firm’s Rapid plants are available in two basic variants, with outputs of 140tonnes/hour and 180tonnes/hour. Customers can also specify from a range of options including hot storage or different hopper configurations. The plants can be supplied wi
  • SAE’s efficient new storage tanks
    April 9, 2018
    SAE claims high energy efficiency for its eTANKS, which also meet the latest economic, environmental and transport requirements.
  • Vögele Super 1803-3i wheeled paver rides high in the Swiss Alps
    December 18, 2017
    Asphalt paving is a challenge in the rough terrain of the Swiss Alps and nowhere more so than in the mountain village of Castiel. Extreme slopes, narrow roads and steep precipices place demands on the paving team and machinery. In the town of Castiel, in the Arosa district of the canton Graubünden, contractor HEW Bauunternehmung opted to use Vögele’s Super 1803-3i wheeled paver for rehabilitation of the combined base and surface course on a farm track. The site is around 1,200m above sea level and an