A customer in Guatemala has bought a second Lintec & Linnhoff continuous asphalt mixing plant from equipment dealer Guasueca. The new Lintec CDP14001M plant joins the customer’s existing Lintec CDP5001M, the smallest in this range. As soon as the new plant had been delivered to the customer, it was sent to support road improvement projects in Cobán, central Guatemala, over 200km from Guasueca’s HQ in Guatemala City.
When asphalting the inside of the newly raised edge of a water dam, Austrian road construction company Strabag faced a challenge. The paver had to be operated at an angle of between 34-41 degrees with material fed into the hopper from a ledge just 2.8m wide on the edge of the dam.
The Waldeck 2 kidney-shaped hydroelectric station is located on a mountaintop about 500m above sea level on Lake Eder in central Germany. The dam, owned by global energy group E.ON, has a perimeter of about 3km. An important pa