Skip to main content

A1 Birtley to Coal House North Dene footbridge installation

For more information on companies in this article

Related Content

  • Goldhofer rescues O&K RH 120-E from Calenturitas de Prodeco Mine
    November 1, 2016
    It was reportedly a logistical challenge to collect a massive front shovel excavator from the open pit coal mine Calenturitas de Prodeco in north-eastern Colombia. The twin engines of the 290-tonne O&K RH 120-E mining excavator had given up the ghost and could not be repaired on site, leaving the monster stranded atop a high mound of earth. So the mining company contracted heavy haulage specialist Boom Logistics to collect the excavator and transport it to the repair shop 22km away. http://www.goldho
  • Peru priority PPP project planned
    February 27, 2023
    Peru’s priority PPP project is being planned.
  • India’s highway projects commencing
    April 22, 2021
    A series of highway projects are commencing in India.
  • VIDEO: Barcelona wheelchair user weaving in traffic, passes cars
    July 25, 2016
    A wheelchair-bound man in Spain has been caught on camera weaving in and out of Barcelona traffic and moving faster than surrounding vehicles. The street racer was cruising along Barcelona's Carrer de Muntaner when a motorcycle passenger took the video. You Tube videos of speeding wheel chair users are becoming more common. But so too are videos of people who generally want more mobility out their wheelchair. So click here to see a more sensible way to live life in your wheelchair in the fast lane. Appa