Skip to main content

Search

Ascorel introduces MC 803 safety system
April 16, 2012
New from Ascorel Controls is the MC 803 safety and command system. Its software and sensors are tailored to fit different types of equipment such as tower or mobile cranes, earthmoving equipment and access platforms. Features of this latest model include a colour touch screen and higher capacity communication systems as well as double-redundancy in the safety systems.
Mobile control of concrete production
April 16, 2012
Command Alkon has launched the COMMANDbatch CP, a totally automated solution for the production of manufactured concrete products. COMMANDbatch CP is a Windows-based system that is fully compatible with standard concrete production equipment. Advanced process control features deliver accurate batching as well as accelerated production and clear well-organised visuals enable system process to be monitored and controlled with ease.
Cummins announces record sales
April 16, 2012
The year 2011 was the most successful year in Cummins’ history, according to Hugh Foden, executive director of Cummins off-highway business.“We achieved sales of $18bn, split 50:50 between off- and on-highway sectors,” he said. “Growth in the construction equipment sector is very important to us and we now power more OEMs than ever before.
Bell Equipment unveils its ‘evolutionary’ E-series ADT
April 16, 2012
South African articulated dump truck manufacturer Bell Equipment unveiled a new generation of ADTs at INTERMAT yesterday. The new E-series – E is for evolutionary – boasts a wider hood and a “more imposing styling” according to the company. It is planned to go into production in 2013. Bell Equipment chief executive Gary Bell said, “We believe that our D-series has successfully met the challenges of the world’s job sites and has many strengths and features across the range that our customers would like to se
INTERMAT launch for Cummins QSF 2.8
April 16, 2012
Cummins has revealed its latest engine platform to cover the 37-55kW sector. Called the QSF2.8, the new four-cylinder platform is the smallest engine from Cummins to use full-authority electronic controls for high-pressure common rail injection. The 2.8litre engine is available in naturally aspirated (37kW) and turbocharged (55kW) packages, and has been developed as a global engine platform.
Yanmar launches SV100-1 excavator at INTERMAT
April 16, 2012
Launched at INTERMAT in prototype form, the SV100-1 is now Yanmar’s largest excavator. Tipping the scales at 10.3tonnes, the reduced tailswing midi excavator gets a two-piece boom and additional counterweight. Powered by a 54.7kW 4TNV98T engine, the excavator offers a 4.48m dig depth, sits on 450mm wide rubber tracks, and measures 2.3m wide. A fourth auxiliary circuit is available as an option.
Continued connectivity reflect Trimble launches
April 16, 2012
Three new solutions from Trimble Heavy Civil Construction designed to connect the construction site and lead to increased efficiency and reduced costs has been unveiled at the show. The solutions for heavy civil construction professionals include the Trimble Connected Office, the Trimble Connected Controller and the Trimble Connected Machine.
A new bridge project will help develop Sumatra in Indonesia
April 16, 2012
Construction work on Indonesia’s Sunda Straits Bridge is planned to start in 2014. The 40,000ha of land required for the project has been prepared by the government. The project forms part of a wider plan to boost the economy growth of Sumatra. The Public Works Ministry is preparing the road development master plan to link Aceh to Lampung. The Indonesian Government will also look into developing the Malacca Straits following the completion of the Sunda Straits Bridge.
A new bridge link will improve connectivity in the Ural mountains
April 16, 2012
By order of Natalya Komarova, the governor of the Khanty-Mansi Autonomous Area (Urals), A feasibility study is underway for the second bridge across the Ob River construction in Russia’s Surgut region. The 1.56km bridge will take 5-6 years to construct and will cost over US$1 billion to build. The first bridge over the Ob River was built in 2000. Average daily traffic already exceeds its planned volume, which is why the second crossing is required.
New tunnel link in Serbia’s capital Belgrade
April 16, 2012
Works on Serbia’s Strazevica tunnel is due for completion in May 2012. The tunnel forms part of the Belgrade ringroad. Serbia’s Government is also planning to finish the construction of a total of 200km of the Corridor 10 motorway, following the completion of the Strazevica-Bubanj and Batajnica-Dobanovci sections. Work on the remaining 130km will commence soon. Meanwhile work on the Ljig-Preljina section of Corridor 11 is now underway.