Skip to main content

Yorkshire Water’s time-saving 3M manhole cover repair kit

A novel application for an existing 3M product has given Yorkshire Water a time-saving manhole cover repair solution. When staff at the company, which maintains just under 1,000kms of water and sewerage pipework, and deploys a team of street furniture operatives to deal with reports of damaged covers, realised that in many cases the manhole cover frame was compliant but the lid had dropped within, they approached 3M to discuss a solution that would avoid excavations and time-consuming replacements. “W
September 26, 2013 Read time: 2 mins
A novel application for an existing 152 3M product has given Yorkshire Water a time-saving manhole cover repair solution.

When staff at the company, which maintains just under 1,000kms of water and sewerage pipework, and deploys a team of street furniture operatives to deal with reports of damaged covers, realised that in many cases the manhole cover frame was compliant but the lid had dropped within, they approached 3M to discuss a solution that would avoid excavations and time-consuming replacements.

“We had worked with 3M previously, regularly using Scotchkote pipe lining products, and decided to consult with them about our problem," said Nicola Duckett, contract support technician for Yorkshire Water.

“After recommending the Scotchkote Engineering Repair Kit, which had not previously been used for this application, we were provided with full training and support from our partners at 3M.

Each treatment with the kit has resulted in cost savings compared to replacement, as well as a reduction in disruption for road users. The environmental benefits are also significant, reducing material sent to landfill and fewer carbon emissions.”

The Scotchkote Engineering Repair Kit is said by 3M to be a fast and effective solution for sunken or rocking covers, safely levelling the cover with minimal disruption to road users and negating the need to replace the manhole device. At the heart of the kit is 3M’s Scotchkote Urethane Metal Repair RG501: a rapid-repair curing system for rebuilding or repairing metalwork with a good mechanical strength. The kit also includes Scotchkote 020 Cleaner and Scotchkote Release Agent 035 to ensure good adhesion and enhance the reliability of the repair. It’s available through Maker Coating Systems, suppliers of specialist coating products and consultancy services for industrial applications.

Ian Tindall, business development director for 3M’s infrastructure protection division said, “The Scotchkote Engineering Repair Kit by 3M is an ideal solution for repairing metal manhole covers, providing a repair strong enough to deal with the weight of traffic yet which cures in only 30 minutes, allowing the cover and therefore the road surface to be returned to full use much more quickly than if excavating the surface and replacing the cover entirely.”

For more information on companies in this article

Related Content

  • Crack infill system ideal reinstatement solution
    February 17, 2012
    Overnight repair work on a major English motorway has avoided the major traffic disruption and significantly increased road surfacing costs that would have occurred if left untreated.
  • From rubber to nanotechnology, new additives give longer life
    March 12, 2014
    This month: rubber comes to the rescue for cash-strapped UK authorities and Italian towns plagued by road noise; Japanese nanotechnology fights monsoon damage in India; and a new research programme promises to help define whether ‘sustainable’ bitumen technologies really live up to their billing - Kristina Smith writes A new venture in the UK aims to encourage the use of recycled tyres in road pavements. Billian UK is now manufacturing GTR Pellets which combine bitumen, ground tyre rubber (GTR) and miner
  • Sheffield duty for a Miller PowerLatch
    June 3, 2019
    The Miller PowerLatch Tilt was recently the attachment of choice for Yorkshire-based engineering consultancy JN Bentley, part of global engineering consultancy Mott MacDonald.
  • Speed and precision make for perfect tunnelling combination
    May 21, 2014
    Speed and precision have been the hallmarks of a number of major road tunnelling projects across the globe over the last 12 months, as the latest sector equipment from leading manufacturers has found itself in high demand. Guy Woodford reports Herrenknecht tunnel boring machines (TBM) have been busy tunnelling under major Chinese rivers, demonstrating phenomenal speed, top safety levels and extreme precision while playing a key role in the construction of road tunnels in the Yangtze River Delta. The Yang