Skip to main content

Yorkshire Water’s time-saving 3M manhole cover repair kit

A novel application for an existing 3M product has given Yorkshire Water a time-saving manhole cover repair solution. When staff at the company, which maintains just under 1,000kms of water and sewerage pipework, and deploys a team of street furniture operatives to deal with reports of damaged covers, realised that in many cases the manhole cover frame was compliant but the lid had dropped within, they approached 3M to discuss a solution that would avoid excavations and time-consuming replacements. “W
September 26, 2013 Read time: 2 mins
A novel application for an existing 152 3M product has given Yorkshire Water a time-saving manhole cover repair solution.

When staff at the company, which maintains just under 1,000kms of water and sewerage pipework, and deploys a team of street furniture operatives to deal with reports of damaged covers, realised that in many cases the manhole cover frame was compliant but the lid had dropped within, they approached 3M to discuss a solution that would avoid excavations and time-consuming replacements.

“We had worked with 3M previously, regularly using Scotchkote pipe lining products, and decided to consult with them about our problem," said Nicola Duckett, contract support technician for Yorkshire Water.

“After recommending the Scotchkote Engineering Repair Kit, which had not previously been used for this application, we were provided with full training and support from our partners at 3M.

Each treatment with the kit has resulted in cost savings compared to replacement, as well as a reduction in disruption for road users. The environmental benefits are also significant, reducing material sent to landfill and fewer carbon emissions.”

The Scotchkote Engineering Repair Kit is said by 3M to be a fast and effective solution for sunken or rocking covers, safely levelling the cover with minimal disruption to road users and negating the need to replace the manhole device. At the heart of the kit is 3M’s Scotchkote Urethane Metal Repair RG501: a rapid-repair curing system for rebuilding or repairing metalwork with a good mechanical strength. The kit also includes Scotchkote 020 Cleaner and Scotchkote Release Agent 035 to ensure good adhesion and enhance the reliability of the repair. It’s available through Maker Coating Systems, suppliers of specialist coating products and consultancy services for industrial applications.

Ian Tindall, business development director for 3M’s infrastructure protection division said, “The Scotchkote Engineering Repair Kit by 3M is an ideal solution for repairing metal manhole covers, providing a repair strong enough to deal with the weight of traffic yet which cures in only 30 minutes, allowing the cover and therefore the road surface to be returned to full use much more quickly than if excavating the surface and replacing the cover entirely.”

For more information on companies in this article

Related Content

  • Thermal Road Repairs and Rowad in Egypt deal
    July 28, 2025
    Low-carbon asphalt repair technology from UK-based Thermal Road Repairs will be used by Rowad Modern Engineering, based in Cairo, for Egypt and regions.
  • Developments in concrete road construction
    February 7, 2012
    Innovative developments are pushing forward concrete road construction techniques. The concrete road sector looks to benefit from some key innovations and developments now coming to market or being employed in different territories. Irregular weather and environmental conditions can alter the rate at which concrete cures, with a risk of plastic shrinkage cracks that can compromise the integrity of a pavement. Contractors cannot control the environmental conditions of a paving project and when weather patter
  • Treatment Train’ SuDS tool for surface water quality
    November 11, 2013
    An innovative tool aims to help users explore the options for designing and building a surface-water ‘Treatment Train’ as part of Sustainable Drainage Systems (SuDS). The new, free-to-use Treatment Selection Tool, available at www.hydro-int.com/stormtrain/tool, has been developed by Hydro International in response to tougher environmental and planning requirements for SuDS that remove silts, sediments, oils and pollutants from surface water runoff.
  • Out of sight
    July 16, 2012
    With traffic volumes increasing around the world, many existing road links will need to be upgraded or replaced in coming years The need for new road tunnels is particularly intense in many dense urban areas, due to environmental requirements that mean new road links will have to be installed underground. However, improving existing road tunnel links is providing a very large part of the business for this specialised construction segment at present.