Skip to main content

WS Tyler highlights mobile Hydro-Clean washing system

WS Tyler says it has added mobility to the list of benefits of its Hydro-Clean washing system. The company, a member of the wholly-owned German-based Haver & Tyler Processing Technology Alliance, now offers the ability to mount the machine on a chassis for easy movement from place to place within a quarry or even from jobsite to jobsite. As with the original Hydro-Clean, the portable unit effectively cleans deleterious material from aggregate, recycled and other minerals. The results are cleaner products
January 24, 2014 Read time: 2 mins
Now mobile: WS Tyler’s Hydro-Clean washing system
3004 W.S. Tyler says it has added mobility to the list of benefits of its Hydro-Clean washing system.

The company, a member of the wholly-owned German-based Haver & Tyler Processing Technology Alliance, now offers the ability to mount the machine on a chassis for easy movement from place to place within a quarry or even from jobsite to jobsite.

As with the original Hydro-Clean, the portable unit effectively cleans deleterious material from aggregate, recycled and other minerals. The results are cleaner products with higher selling value and profits from material that was previously considered waste.

“In the process, the Hydro-Clean uses up to 75% less water than traditional washers and 15% less energy,” says the company.

“The Hydro-Clean is unique in the industry,” said Matthias Bremer, innovation engineer at W.S. Tyler.

The Hydro-Clean removes silt and clay particles faster than traditional methods, which require soaking the material for long periods to loosen unwanted debris.

According to the company, water consumption ranges from 27-211 gallons/minute (102-799litres), depending on application and model size, compared to log washers that can require up to 800gallons/minute (3,028litres). Of the Total volume of wastewater, up to 90% can be recycled and reused in the Hydro-Clean, which only requires 10% fresh water to operate effectively. “Hydro-Clean units require less energy, ranging from 34hp (26kW) on the smallest of three models to 300hp (225kW) on the largest. With that, the HC 350 can process up to 18tons/hour (16.3tonnes), the HC 1000 can process up to 180tons/hour (163.3tonnes) and the HC 2000 can process up to 360tons/hour (326.5tonnes),” says W.S. Tyler.

“The Hydro-Clean only requires a single rinse screen for discharged material. The only other requirements are a water source, a pump station and a feed conveyor.”








www.WSTyler.ca

For more information on companies in this article

Related Content

  • Essential tunnel maintenance
    March 2, 2012
    Highway road tunnels and inter-city vehicle underpasses are vital components of an essential busy highways network. Keeping them clean is essential. Road tunnels and vehicle underpasses require a specific strength of light. Too bright, and the lamps or lights may dazzle or distract drivers, and too dim the tunnel can seem claustrophobic and daunting, as well as increasing dangers from obstructions and other hazards.
  • In the wash
    June 19, 2012
    Aggregate Processing Solutions (APS) is now offering CDE washing equipment to its contract washing customers after the signing of a new agreement. APS says it has taken delivery of the M2500 mobile washing plant and Aggmax portable logwasher in response to a rise in demand throughout the UK market. John Dunne, managing director of APS, said: “The addition of the CDE modular washing range ensures our customers have access to the most efficient washing systems on the market.”
  • Producing recycled materials at an airport for surface use
    October 1, 2018
    Recycling of materials has been carried out at Cologne/Bonn Airport in a move to boost efficiency Using the Wirtgen KMA 220 mobile cold recycling mixing plant allows road construction materials to be recycled or upgraded onsite and avoids the need for numerous transport trips. The system is also economical, as became clear from a job at Cologne/Bonn airport at the end of 2017. There the plant, located immediately next to the job site, produced around 11,000tonnes of materials for a hydraulically bound ba
  • Using technology to reduce the carbon footprint in asphalt production
    February 13, 2023
    According to Benninghoven, reducing the carbon footprint in asphalt production is feasible by using the latest technology