Skip to main content

Where there’s smoke

Two mechanics in the Ukraine recently took a close interest in a rusty old Russian tank sitting on a plinth, a memorial to the Red Army’s offensive in WWII. The two crawled into the JS-2 tank and after poking around in the engine for a period, managed to fire it up. As the diesel started, a thick black cloud of smoke spewed from the exhausts and the engine then settled to a steady tickover.
September 29, 2014 Read time: 2 mins

Two mechanics in the Ukraine recently took a close interest in a rusty old Russian tank sitting on a plinth, a memorial to the Red Army’s offensive in WWII. The two crawled into the JS-2 tank and after poking around in the engine for a period, managed to fire it up. As the diesel started, a thick black cloud of smoke spewed from the exhausts and the engine then settled to a steady tickover. The diesel engines used in Russia’s WWII tanks were noted for their longevity and simplicity but being able to start following a long period of neglect highlights this rather effectively. Luckily the daring duo decided not to take the tank for a quick spin around their neighbourhood, switching it off instead and quickly walking away. The tank had been previously rusting peacefully while used as a memorial in the city of Kostiantynivka, in the east of Ukraine and local officials are now looking into why it had been left with its engine still capable of being started. Police are meanwhile considering if charges should be brought against the pair for tampering with the tank although it is not clear whether the two broke any laws. It is worth noting that Russian tanks were designed to be able to lay down smokescreens using the exhaust from their engines, although in this case it seems that the dirty emissions were due to a lack of use.

Related Content

  • Drilling rig for Russian road project
    March 18, 2016
    A Sandvik Construction DQ500 dimensional stone drill rig has proved useful on a road project in Dagestan, Russia. Local contractor, Dagestan Vzryv Stroy, is using the drill rig to work on the reconstruction of the Avar-Kakheti road. The reconstruction of the Avar-Kakheti road began in early 2014. The local authorities were keen to rebuild a section of the 83km route where it runs through mountains in order to connect Russia with Georgia. The economically important project was given a national grade as i
  • Colombia’s ANI agency is driving forward the 4G PPP programme
    April 4, 2016
    Andrade Moreno is a man on a mission. The head of Colombia's infrastructure agency ANI explains how the organisation is giving foreign companies increasing confidence to invest time and money in the country. David Arminas reports Change, especially when it touches the highest levels of South American business and politics, can bring with it personal danger. Luis Fernando Andrade Moreno, president of Colombia's National Infrastructure Agency - ANI - was aware of this when he took on the role in 2011. B
  • Bang: big bridge blocking boulder broken by blasting
    April 24, 2013
    Following a recent earthquake in China, the roads and highways had to be cleared quickly to allow emergency deliveries, as well as general transport. One key bridge was blocked by a massive boulder that had been dislodged by the quake. As the boulder was too large to move using the excavators or bulldozers that the bridge could support, a decision was made to use blasting instead to clear the path. A drilling rig was brought into place and this machine bored a blasthole into the errant boulder, with the hol
  • Engine manufacturers meeting emissions deadlines
    February 10, 2012
    Engine manufacturers have had to jump through regulatory hoops in recent years, meeting requirements for diesels with ever cleaner exhaust emissions. When this programme was first proposed, many believed the final aims could not be achieved. However on January 1st 2011, the Tier 4 Interim/Stage IIIB emissions regulations will come into force in North America and Europe and all the major diesel manufacturers will have suitable products at the ready. The Tier 4 Interim/Stage IIIB emissions regulations require