Skip to main content

Whale of a time

Motorists in the UK were left feeling decidedly ill due to a rather unusual load being transported along a busy dual carriageway. The drivers had the misfortune to be using the same stretch of road as a truck carrying the carcass of a dead whale.
May 16, 2014 Read time: 1 min
RSSMotorists in the UK were left feeling decidedly ill due to a rather unusual load being transported along a busy dual carriageway. The drivers had the misfortune to be using the same stretch of road as a truck carrying the carcass of a dead whale. The unfortunate creature had died after being stranded on a beach on the south coast of England and five days later was removed, to be taken to a landfill site for disposal. However the whale was rotting and as the truck was being driven, some of its decomposing innards dripped onto the roadway in its wake, leaving a highly unpleasant smell for any motorists following behind.

Related Content

  • Italy road tunnel project excavated
    July 9, 2018
    Italy’s A3 Highway is being upgraded, which will improve transport between Salerno and Calabria. Upgrading Italy’s A3 highway is of prime importance for developing the south of the country and is a project that has been prioritised for construction. The A3 Salerno-Reggio-Calabria highway is a non-toll road managed by ANAS, Italy’s state-owned company that constructs and maintains highways. The route runs a total of 443km, with the road having originally been built between 1966 and 1974. However, the origina
  • McCloskey continues to grow
    January 6, 2017
    Screening and crushing machine manufacturer McCloskey increased its workforce by 30% and added some 12,600m2 of covered workspace in 2012. At the Peterborough facility in Canada, the company has added almost 4,000m2 of warehousing and another 7,250m2 to extend the production line.
  • McCloskey continues to grow
    April 18, 2013
    Screening and crushing machine manufacturer McCloskey increased its workforce by 30% and added some 12,600m2 of covered workspace in 2012. At the Peterborough facility in Canada, the company has added almost 4,000m2 of warehousing and another 7,250m2 to extend the production line.
  • Tunnel breakthrough for new Auckland link in New Zealand
    October 8, 2014
    Auckland’s Western Ring Route project update - Mary Bell writes. A number of integrated projects in Auckland, New Zealand, will improve the lot of road users and cyclists, and significantly alter the topography of the city’s motorway. On September 29th the tunnel boring machine digging the first of twin road tunnels beneath the city broke into daylight after 10 months underground. The new 2.4km-long Waterview tunnels will connect the city’s Northwestern and Southwestern motorways, each carrying three lane