Skip to main content

Water removal

Strength and resilience are claimed for the BluTop range of small diameter ductile iron water pipes from Saint-Gobain PAM UK.
February 9, 2012 Read time: 1 min
Saint-Gobain says that its new ductile iron water pipes offer durability and performance and lower whole life costs over alternative systems
Strength and resilience are claimed for the BluTop range of small diameter ductile iron water pipes from 757 Saint-Gobain PAM UK. The products can be used in an array of roadway applications and have recently passed tough testing in the UK at a special event held in conjunction with Anglian Water. BluTop pipes were drilled and tapped at 250mm intervals by a team from Anglian Water. The pipes were then subjected to repeated heavy blows with a lump hammer but no fractures occurred, proving the durability of the BluTop range according to Saint-Gobain. The drilling and tapping was carried out using off-the-shelf Tyco flat-bossed gunmetal saddles and ferrules and standard drilling and tapping equipment carried by most pipeline contractors. Overall service connection time is just 10-15 minutes, confirming the versatility of the BluTop range. Saint-Gobain says that the BluTop products are lighter than traditional ductile iron pipes, but do not lack in strength and resilience compared with conventional products. The firm adds that using this system can provide leak-free reliability, easy handling, reduced installation costs and high water quality even in contaminated ground. The product is available in 90mm, 110mm and 125mm diameters.

For more information on companies in this article

Related Content

  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.
  • Tunnels - an environmentally attractive option?
    February 21, 2012
    While tunnels are often more expensive than bridges, they can offer environmentally attractive options for transport schemes. Tunnels offer environmentally attractive options for a range of transport infrastructure schemes, but in many cases high construction costs may restrict their use.
  • Brazilian contractor uses novel methods for high quality road
    January 5, 2015
    Cold-in place recycling method provides fast road rebuild in Brazil In Brazil a road contractor has carried out a high quality road rebuilding job, using novel techniques. Contractor Brown Brown is located in Santa Teresinha in the state of Bahia and recently carried out a two-week job for the company to rehabilitate sections of highway BR-381. The highway is an important route in Brazil and runs from Sao Paulo to Belo Horizonte. Highway BR-381 or Rodovia Fernão Dias, as it is called, stretches some 576km
  • Latest bitumen mixes improve roads, reduce noise
    February 14, 2012
    Special bitumen mixes and machines are capable of improving the service life of roads and reducing noise. Mike Woof and Patrick Smith report. The need to improve traffic flow in an important part of the City of Poznan, Poland, led to the decision to build a new 1.13km long dual carriageway.