Skip to main content

Water removal

Strength and resilience are claimed for the BluTop range of small diameter ductile iron water pipes from Saint-Gobain PAM UK.
February 9, 2012 Read time: 1 min
Saint-Gobain says that its new ductile iron water pipes offer durability and performance and lower whole life costs over alternative systems
Strength and resilience are claimed for the BluTop range of small diameter ductile iron water pipes from 757 Saint-Gobain PAM UK. The products can be used in an array of roadway applications and have recently passed tough testing in the UK at a special event held in conjunction with Anglian Water. BluTop pipes were drilled and tapped at 250mm intervals by a team from Anglian Water. The pipes were then subjected to repeated heavy blows with a lump hammer but no fractures occurred, proving the durability of the BluTop range according to Saint-Gobain. The drilling and tapping was carried out using off-the-shelf Tyco flat-bossed gunmetal saddles and ferrules and standard drilling and tapping equipment carried by most pipeline contractors. Overall service connection time is just 10-15 minutes, confirming the versatility of the BluTop range. Saint-Gobain says that the BluTop products are lighter than traditional ductile iron pipes, but do not lack in strength and resilience compared with conventional products. The firm adds that using this system can provide leak-free reliability, easy handling, reduced installation costs and high water quality even in contaminated ground. The product is available in 90mm, 110mm and 125mm diameters.

For more information on companies in this article

Related Content

  • Advances in road markings
    March 16, 2012
    Recent months have seen many major and vital road marking projects and products completed and tested in different parts of the world. Guy Woodford looks at some of them in Europe, North America, the Middle East and Africa. The London borough of Kensington and Chelsea now has one of the most dramatic streetscape designs in Europe. Exhibition Road’s striking chequered granite design, featuring a single surface running from South Kensington Station to Hyde Park and the full width of the road from building to b
  • Maximising cone crusher efficiency
    September 30, 2013
    Ensuring efficient cone crusher operation can deliver major economies of scale for quarrying facilities There are a number of ways in which cone crusher throughput can be optimised. One of the key issues is in keeping the system choke fed during operation, as this maximises the effectiveness of rock-on-rock crushing, extends the wear life of manganese components and ensures a quality product shape. A lack of feed causes inconstant loading, which affects the long-term life of internal components.
  • Breaking with Indeco hammers
    April 16, 2018
    Contractor New Hampshire Rock Reduction is using hydraulic hammers from Indeco for rock breaking and excavation duties. The firm says that it selected these units so as to optimise productivity and has used the breakers in quarrying as well as site development applications. Located in the northeast corner of the US, New Hampshire is one of the country’s smallest states. Noted for a rocky terrain, New Hampshire’s geology includes a heavy presence of metamorphic, especially igneous, rock formations, which yi
  • Geosynthetics revolutionise ground stabilisation
    March 13, 2012
    As powerful fabrics, geosynthetics and geotextiles have a wide range of applications in many civil engineering applications including roads and airfields. Geosynthetics specialist Tensar is introducing a radical new product that it thinks will revolutionise the construction industry. According to the company, its new product represents the "biggest advance in ground stabilisation technology for 25 years. Six years in development, it is said to offer major improvements in aggregate confinement and soil stabi