Skip to main content

Water removal

Strength and resilience are claimed for the BluTop range of small diameter ductile iron water pipes from Saint-Gobain PAM UK.
February 9, 2012 Read time: 1 min
Saint-Gobain says that its new ductile iron water pipes offer durability and performance and lower whole life costs over alternative systems
Strength and resilience are claimed for the BluTop range of small diameter ductile iron water pipes from 757 Saint-Gobain PAM UK. The products can be used in an array of roadway applications and have recently passed tough testing in the UK at a special event held in conjunction with Anglian Water. BluTop pipes were drilled and tapped at 250mm intervals by a team from Anglian Water. The pipes were then subjected to repeated heavy blows with a lump hammer but no fractures occurred, proving the durability of the BluTop range according to Saint-Gobain. The drilling and tapping was carried out using off-the-shelf Tyco flat-bossed gunmetal saddles and ferrules and standard drilling and tapping equipment carried by most pipeline contractors. Overall service connection time is just 10-15 minutes, confirming the versatility of the BluTop range. Saint-Gobain says that the BluTop products are lighter than traditional ductile iron pipes, but do not lack in strength and resilience compared with conventional products. The firm adds that using this system can provide leak-free reliability, easy handling, reduced installation costs and high water quality even in contaminated ground. The product is available in 90mm, 110mm and 125mm diameters.

For more information on companies in this article

Related Content

  • Cold recycling helps rebuild of Brazil’s Ayrton Senna highway
    September 28, 2015
    Brazil’s Ayrton Senna Highway has been rebuilt using cold recycling. Brazil’s SP-070 is also known as the Ayrton Senna Highway and is a major highway in the country, carrying heavy traffic volumes. For its rebuild, the time-saving, cost-efficient and eco-friendly benefits of the cold recycling process have been put to the test. The SP-070 provides a key transport link between São Paulo and Campos do Jordão, Vale do Paraíba and Rio de Janeiro, as well as being the main access route to Guarulhos Interna
  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • New Penang Bridge takes shape
    May 9, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • Developments in asphalt compaction machines
    July 4, 2012
    Mike Woof reviews the latest compaction market developments In the run-up to the upcoming World of Asphalt event in Orlando, Florida in March, the leading compaction equipment firms are rolling out upgraded and improved machines. With market conditions tough worldwide, customers are also likely to be encouraged with competitive deals on purchasing new machines and replacing ageing fleets.