Skip to main content

Volvo machines facilitate German highway construction project

German contractor Gebrüder Bantle is working on a large ring road project in Bösingen, excavating and building 6km of highway and nine bridges. The region’s main road, the B462, provides an important link between the A5 Rheintalautobahn and A81 Stuttgart highways. The B462 carries some 12,000 vehicles/day and suffers congestion at peak periods, so a new ring road will help reduce delays for commuters. The Dunningen project consists of a 6.4km ring road, nine bridges and several access roads. Gebrüder Bantle
August 15, 2014 Read time: 2 mins
An extensive fleet of Volvo CE machines, including a G946B grader, has been put to use building a new ringroad section of the B462 around Bösingen in Germany
German contractor Gebrüder Bantle is working on a large ring road project in Bösingen, excavating and building 6km of highway and nine bridges. The region’s main road, the B462, provides an important link between the A5 Rheintalautobahn and A81 Stuttgart highways.

The B462 carries some 12,000 vehicles/day and suffers congestion at peak periods, so a new ring road will help reduce delays for commuters. The Dunningen project consists of a 6.4km ring road, nine bridges and several access roads.

Gebrüder Bantle is managing the foundation work as well as the road construction.
The company specialises in road and civil construction and produces gravel from its two quarries and raw gypsum for cement production, as well as being a partner for an asphalt mixing plant. The contractor has an extensive fleet of 359 Volvo CE machines, including three L30G-Series, two L35G-Series, one L180E-Series and one L250G-Series wheel loaders, two EW160D-Series wheeled excavators, an EC290C-Series crawler excavator, one A40E-Series articulated hauler and a new G946B-Series motor grader.

To build up the road’s base layer, the Volvo G946B-Series motor grader first levelled the 11.5m wide of earth, then layered frost protection gravel over the top to a depth of 450mm using material from the firm’s own quarry.

Later the paver crew laid the asphalt base on the top along with the binder and surface layer, again using material from the company’s own production facilities. The new Volvo G946 motor grader is equipped with a grader control unit that has helped keep the project on track.

Related Content

  • Volvo CE develops efficient new soil compactors
    December 17, 2013
    Volvo CE’s redesigned soil compactors offer improved cab designs and better performance, while the firm is offering other glimpses of future technologies - Nick Johnson reports This summer marked the 55th anniversary of Volvo Days – an event that enables Volvo Construction Equipment customers to find out more about the company’s latest products and services. An impressive machine demonstration at the Volvo Customer Centre in Eskilstuna, Sweden provided the official launch for several new models, including s
  • Volvo CE Pavers working in Montana
    June 23, 2015
    Based in Montana, contractor Century Companies is now benefiting from an updated fleet of asphalt paving machines from Volvo CE. The company has operated Volvo CE’s Blaw-Knox pavers for many years and also has two Blaw-Knox PF510s, two PF3200s and a PF410 as well as Volvo DD70, DD118 and DD25B double drum compactors. However it has now added two of the 3m class P7110 tracked machines to its fleet. These were used on a job some 16km from the North Dakota border on the periphery of the Bakken Formation. This
  • UAE quarry facility boosting productivity
    May 15, 2015
    A United Arab Emirates quarry is putting its Volvo fleet to the test in harsh conditions A quarrying facility in the United Arab Emirates (UAE), is boosting output following the commissioning of a new machine fleet for loading and hauling duties. The quarry is located in the northeast of the UAE in Fujairah, an emirate almost entirely surrounded by mountains. This rugged landscape is the product of an estimated 800 million years of geological activity and is the source of a high quality limestone used in
  • High quality Swedish stone
    February 10, 2012
    Close to Sweden's second largest city Göthenburg lies the efficient Jehander quarrying operation run by Heidelberg Cement. The site produces around 9,000tonnes/day at peak seasonal demand and has an output of some 1,000,000tonnes/year. The site has recently renewed its operating permission and now has the necessary approval to work until 2021.