Skip to main content

Volvo machines facilitate German highway construction project

German contractor Gebrüder Bantle is working on a large ring road project in Bösingen, excavating and building 6km of highway and nine bridges. The region’s main road, the B462, provides an important link between the A5 Rheintalautobahn and A81 Stuttgart highways. The B462 carries some 12,000 vehicles/day and suffers congestion at peak periods, so a new ring road will help reduce delays for commuters. The Dunningen project consists of a 6.4km ring road, nine bridges and several access roads. Gebrüder Bantle
August 15, 2014 Read time: 2 mins
An extensive fleet of Volvo CE machines, including a G946B grader, has been put to use building a new ringroad section of the B462 around Bösingen in Germany
German contractor Gebrüder Bantle is working on a large ring road project in Bösingen, excavating and building 6km of highway and nine bridges. The region’s main road, the B462, provides an important link between the A5 Rheintalautobahn and A81 Stuttgart highways.

The B462 carries some 12,000 vehicles/day and suffers congestion at peak periods, so a new ring road will help reduce delays for commuters. The Dunningen project consists of a 6.4km ring road, nine bridges and several access roads.

Gebrüder Bantle is managing the foundation work as well as the road construction.
The company specialises in road and civil construction and produces gravel from its two quarries and raw gypsum for cement production, as well as being a partner for an asphalt mixing plant. The contractor has an extensive fleet of 359 Volvo CE machines, including three L30G-Series, two L35G-Series, one L180E-Series and one L250G-Series wheel loaders, two EW160D-Series wheeled excavators, an EC290C-Series crawler excavator, one A40E-Series articulated hauler and a new G946B-Series motor grader.

To build up the road’s base layer, the Volvo G946B-Series motor grader first levelled the 11.5m wide of earth, then layered frost protection gravel over the top to a depth of 450mm using material from the firm’s own quarry.

Later the paver crew laid the asphalt base on the top along with the binder and surface layer, again using material from the company’s own production facilities. The new Volvo G946 motor grader is equipped with a grader control unit that has helped keep the project on track.

Related Content

  • Tough duty cycle for LiuGong machines
    May 11, 2018
    The first SDLG wheeled loader sold into Southern Africa is still going strong, despite operating in tough working conditions. The LG958L machine has clocked over 5,000 working hours in an arduous application at a portside dry bulk facility in South Africa. The machine was supplied in February 2012 and continues to front operations at the portside bulk-handling facility in Durban, South Africa. The 16tonne wheeled loader is owned by South African Bulk Terminals (SABT) and is used to load and off-load the 2.
  • Historic Oakland Bay Bridge receives a new asphalt road surface
    March 31, 2014
    Part of an iconic US bridge has been given a new lease of life, as Mike Woof reports The western section of the historic Oakland Bay Bridge in the US state of California has recently benefited from a series of improvements to strengthen its structural integrity and also upgrade the running surface. Contractor OC Jones & Sons of Berkeley CA, paved large portions of the bridge, taking on two different projects as part of the work. First was placement of the specialised epoxy on the self-anchored suspension (S
  • Runway rebuild with Caterpillar machines
    February 2, 2017
    Kilgore Contracting has used Caterpillar machines to repave a runway at the Provo Utah Municipal Airport.
  • CRCP is first choice for Belgian highway
    November 28, 2012
    Dan Gilkes reports on a Belgian highway upgrade When the Ministry of Public Works in the Belgian State of Flanders decided to reconstruct and resurface 19km of the N49 Antwerp-Knokke Expressway, continuously reinforced concrete paving (CRCP) with an exposed aggregate surface was the natural material choice. Indeed exposed aggregate, with its high grip and low noise benefits, has been the first option for all motorway surfacing work in Belgium since the 1980s. However, the €15.65 million contract is not a li