Skip to main content

Volvo machines facilitate German highway construction project

German contractor Gebrüder Bantle is working on a large ring road project in Bösingen, excavating and building 6km of highway and nine bridges. The region’s main road, the B462, provides an important link between the A5 Rheintalautobahn and A81 Stuttgart highways. The B462 carries some 12,000 vehicles/day and suffers congestion at peak periods, so a new ring road will help reduce delays for commuters. The Dunningen project consists of a 6.4km ring road, nine bridges and several access roads. Gebrüder Bantle
August 15, 2014 Read time: 2 mins
An extensive fleet of Volvo CE machines, including a G946B grader, has been put to use building a new ringroad section of the B462 around Bösingen in Germany
German contractor Gebrüder Bantle is working on a large ring road project in Bösingen, excavating and building 6km of highway and nine bridges. The region’s main road, the B462, provides an important link between the A5 Rheintalautobahn and A81 Stuttgart highways.

The B462 carries some 12,000 vehicles/day and suffers congestion at peak periods, so a new ring road will help reduce delays for commuters. The Dunningen project consists of a 6.4km ring road, nine bridges and several access roads.

Gebrüder Bantle is managing the foundation work as well as the road construction.
The company specialises in road and civil construction and produces gravel from its two quarries and raw gypsum for cement production, as well as being a partner for an asphalt mixing plant. The contractor has an extensive fleet of 359 Volvo CE machines, including three L30G-Series, two L35G-Series, one L180E-Series and one L250G-Series wheel loaders, two EW160D-Series wheeled excavators, an EC290C-Series crawler excavator, one A40E-Series articulated hauler and a new G946B-Series motor grader.

To build up the road’s base layer, the Volvo G946B-Series motor grader first levelled the 11.5m wide of earth, then layered frost protection gravel over the top to a depth of 450mm using material from the firm’s own quarry.

Later the paver crew laid the asphalt base on the top along with the binder and surface layer, again using material from the company’s own production facilities. The new Volvo G946 motor grader is equipped with a grader control unit that has helped keep the project on track.

Related Content

  • Tunnels eliminate bottlenecks
    February 10, 2012
    Some of the bottlenecks on the multi-lane Mittlere Ring, Munich, Germany, one of the main arterial roads circling the city centre have been eliminated by the addition of new tunnels. The Luise-Kiesselbach Square, the last section of this road improvement effort, is an important traffic hub south-west of the city where motorways A96 from Lindau and A5 from Garmisch meet, causing long delays in daily rush-hour traffic, writes Patrick Smith.
  • Trimble machine control technology onsite
    June 3, 2022
    A construction firm in New Zealand is making good use of machine control technology from Trimble. The technology is helping to reduce costs and boost quality, while also addressing the issue of operator skills.
  • Waste to road construction
    December 13, 2022
    In Australia, the use of waste materials in roads, including higher proportions of RAP, is gaining pace. Meanwhile, the industry in the US is looking to invest in net zero technologies
  • Vögele | Sustainable road rehabilitation on the Dutch coast
    January 23, 2024
    In-place cold recycling with Wirtgen Group machines