Skip to main content

Volvo machines facilitate German highway construction project

German contractor Gebrüder Bantle is working on a large ring road project in Bösingen, excavating and building 6km of highway and nine bridges. The region’s main road, the B462, provides an important link between the A5 Rheintalautobahn and A81 Stuttgart highways. The B462 carries some 12,000 vehicles/day and suffers congestion at peak periods, so a new ring road will help reduce delays for commuters. The Dunningen project consists of a 6.4km ring road, nine bridges and several access roads. Gebrüder Bantle
August 15, 2014 Read time: 2 mins
An extensive fleet of Volvo CE machines, including a G946B grader, has been put to use building a new ringroad section of the B462 around Bösingen in Germany
German contractor Gebrüder Bantle is working on a large ring road project in Bösingen, excavating and building 6km of highway and nine bridges. The region’s main road, the B462, provides an important link between the A5 Rheintalautobahn and A81 Stuttgart highways.

The B462 carries some 12,000 vehicles/day and suffers congestion at peak periods, so a new ring road will help reduce delays for commuters. The Dunningen project consists of a 6.4km ring road, nine bridges and several access roads.

Gebrüder Bantle is managing the foundation work as well as the road construction.
The company specialises in road and civil construction and produces gravel from its two quarries and raw gypsum for cement production, as well as being a partner for an asphalt mixing plant. The contractor has an extensive fleet of 359 Volvo CE machines, including three L30G-Series, two L35G-Series, one L180E-Series and one L250G-Series wheel loaders, two EW160D-Series wheeled excavators, an EC290C-Series crawler excavator, one A40E-Series articulated hauler and a new G946B-Series motor grader.

To build up the road’s base layer, the Volvo G946B-Series motor grader first levelled the 11.5m wide of earth, then layered frost protection gravel over the top to a depth of 450mm using material from the firm’s own quarry.

Later the paver crew laid the asphalt base on the top along with the binder and surface layer, again using material from the company’s own production facilities. The new Volvo G946 motor grader is equipped with a grader control unit that has helped keep the project on track.

Related Content

  • BICES Beijing; China bouncing back
    November 13, 2017
    At the BICES exhibition in Beijing, it was clear that the Chinese construction market has bounced back - Mike Woof writes. Demand for construction machines is now improving in China once more, with the backlog of unsold or nearly new secondhand units having been absorbed. This was apparent at the recent BICES construction machinery exhibition held in Beijing, where firms were more bullish than in previous years.
  • The doors open on a record-breaking bauma China 2018
    November 22, 2018
    You can tell a lot from numbers – and this year’s bauma China exhibition is set to be a record-breaker! The exhibitor numbers represent an impressive 11% increase on the 2,958 exhibitors from 41 countries that presented their products and innovations to around 170,000 visitors at the 2016 event.
  • Developments in concrete pavers boosts quality
    July 13, 2012
    The latest technology continues to improve the quality of concrete paving while contractors are also benefiting from more adaptable equipment - Mike Woof reports For many concrete paving applications, versatility is required rather than a high production rate. Leading paver manufacturers such as GOMACO, Power Curbers, Terex and Wirtgen all offer high mobility machines that can be adjusted to cope with an array of tasks. For a contractor, the advantage of these smaller pavers is that they can be configured q
  • Producing recycled materials at an airport for surface use
    October 1, 2018
    Recycling of materials has been carried out at Cologne/Bonn Airport in a move to boost efficiency Using the Wirtgen KMA 220 mobile cold recycling mixing plant allows road construction materials to be recycled or upgraded onsite and avoids the need for numerous transport trips. The system is also economical, as became clear from a job at Cologne/Bonn airport at the end of 2017. There the plant, located immediately next to the job site, produced around 11,000tonnes of materials for a hydraulically bound ba