Skip to main content

Versatility for Benninghoven’s new asphalt plan

Benninghoven claims that its new BBM 1250 asphalt plant combines versatility with mobility. Designed for ease of transport and fast set up times, the BBM 1250 is also said to deliver high quality output due to the use of reliable, cutting-edge German technology.
January 6, 2017 Read time: 2 mins
BBM 1250 asphalt plant

167 Benninghoven claims that its new BBM 1250 asphalt plant combines versatility with mobility. Designed for ease of transport and fast set up times, the BBM 1250 is also said to deliver high quality output due to the use of reliable, cutting-edge German technology.

At the centre of the plant is the new BBX 1250 screening and mixer unit, which can be transported on one truck.

The entire plant can be transported in five truck loads meanwhile. The BBX 1250 section comprises a four deck screen capable of separating 90tonnes of aggregate/hour and a 1.25tonne capacity mixer. With this set up the plant can deliver an output of up to 100tones/hour and can be quickly taken apart and moved for use on another site. A 40tonne capacity crane is required for set up purposes.

The plant comes supplied with the necessary aggregate fractions in its four cold feed hoppers. These feature a convenient loading width of 3.6m. The drying drum is mounted on the same chassis to ensure quick and efficient drying of the aggregate. The plant’s four deck screen separates material into the four comportments of the hot aggregate bin unit, which can store up to 20tonnes.

The digital real-time weighing and dosing technology of this plant ensures that the mixer is supplied with the right components as required for the specified formula. The bitumen supply is also mounted on a chassis. In addition to the 40m³ tank, the filling and dosing units are also integrated so as to ensure optimum access while saving space.

The innovative dust collection system includes a filter and exhauster as well as a 15m³ silo for reclaimed filler and a 25m³ silo for imported filler.

This makes the BBM 1250 ideal for mobile use throughout the world. The components' user-friendly design and the intuitive control system BLS 3000 make this plant a reliable partner in the production of high-quality asphalt.

For more information on companies in this article

Related Content

  • Ammann has developed a high mobility asphalt plant
    February 17, 2016
    The new Prime 100 mobile asphalt plant from Ammann is designed for high mobility. This continuous plant can deliver 100tonnes/hour and features all of its main components inside a single standard shipping container. A company spokesperson said, “All you have to do is connect the bitumen tank and an electric power source.” The new Prime 100 unit is the latest addition to the Prime range and is a smaller and even more mobile version of the well proven Prime 140, with its 140tonnes/hour capacity. In addition
  • Ammann has developed a high mobility asphalt plant
    January 6, 2017
    The new Prime 100 mobile asphalt plant from Ammann is designed for high mobility. This continuous plant can deliver 100tonnes/hour and features all of its main components inside a single standard shipping container. A company spokesperson said, “All you have to do is connect the bitumen tank and an electric power source.” The new Prime 100 unit is the latest addition to the Prime range and is a smaller and even more mobile version of the well proven Prime 140, with its 140tonnes/hour capacity. In addition
  • Maximum performance from Emulbitume’s mini cold mix plant
    November 30, 2018
    says that says that it has delivered and set up its first mini cold mix unit in Algeria. The fully automatic machine is a complete production system including production of cold mix and packing system for bags and buckets. A PLC – programmable logic controller - monitors the system and makes decisions based upon a custom programme to control output. Emulbitume assembled the unit and provided initial technical assistance including start-up for its customer, Souf Bitume, near Oued Souf. Em
  • New batching plant for pre-cast facility
    September 6, 2021
    As part of its recent £10 million expansion, paving and walling manufacturer, Tobermore, has recently in a new Rapid concrete batching plant. The new Rapid plant will allow a further one million m2 of block paving/year