Skip to main content

Versatility for Benninghoven’s new asphalt plan

Benninghoven claims that its new BBM 1250 asphalt plant combines versatility with mobility. Designed for ease of transport and fast set up times, the BBM 1250 is also said to deliver high quality output due to the use of reliable, cutting-edge German technology.
January 6, 2017 Read time: 2 mins
BBM 1250 asphalt plant

167 Benninghoven claims that its new BBM 1250 asphalt plant combines versatility with mobility. Designed for ease of transport and fast set up times, the BBM 1250 is also said to deliver high quality output due to the use of reliable, cutting-edge German technology.

At the centre of the plant is the new BBX 1250 screening and mixer unit, which can be transported on one truck.

The entire plant can be transported in five truck loads meanwhile. The BBX 1250 section comprises a four deck screen capable of separating 90tonnes of aggregate/hour and a 1.25tonne capacity mixer. With this set up the plant can deliver an output of up to 100tones/hour and can be quickly taken apart and moved for use on another site. A 40tonne capacity crane is required for set up purposes.

The plant comes supplied with the necessary aggregate fractions in its four cold feed hoppers. These feature a convenient loading width of 3.6m. The drying drum is mounted on the same chassis to ensure quick and efficient drying of the aggregate. The plant’s four deck screen separates material into the four comportments of the hot aggregate bin unit, which can store up to 20tonnes.

The digital real-time weighing and dosing technology of this plant ensures that the mixer is supplied with the right components as required for the specified formula. The bitumen supply is also mounted on a chassis. In addition to the 40m³ tank, the filling and dosing units are also integrated so as to ensure optimum access while saving space.

The innovative dust collection system includes a filter and exhauster as well as a 15m³ silo for reclaimed filler and a 25m³ silo for imported filler.

This makes the BBM 1250 ideal for mobile use throughout the world. The components' user-friendly design and the intuitive control system BLS 3000 make this plant a reliable partner in the production of high-quality asphalt.

For more information on companies in this article

Related Content

  • Wirtgen: low-emission recycling near Legoland
    March 22, 2024
    Wirtgen, Vögele and Hamm were on a section of the busy E45 highway close to the famous Legoland resort at Billlund, Denmark.
  • Marini’s full recycling technology package
    November 26, 2018
    Marini is unveiling its advanced full recycling technology (FRT) mixing plant, which is said to meet customer needs for advanced asphalt recycling systems. In addition the firm has new asphalt plant developments, with one aimed at high output and the other designed for mobility. Designed to comply with the latest requirements on the use of recycled asphalt pavement (RAP) in key construction markets, the firm says that the FRT integrates an environmentally-friendly approach with an innovative mechanical str
  • Smart Astec plant for Florida firm
    August 18, 2015
    US-based P&S Paving has boosted output from its asphalt facility in Daytona, Florida with the purchase of a new plant from Astec Industries. The firm supplies a wide range of customers ranging from small urban works up to large highway projects for the Florida Department of Transportation. As a result the company needed a modern, versatile and productive plant capable of delivering an array of mixes and quantities, including high quality materials. Tim Phillips, president of P&S Paving said, “We want
  • Strong interest for construction equipment show
    February 21, 2012
    Most of the major manufacturers of extraction and crushing equipment worldwide will be present at the upcoming Hillhead show, either directly or through local distributors. Set in a working quarry, the Hillhead exhibition has set a lead for the quarrying sector. An industry only show, the event is being held this year at the Hillhead Quarry, Buxton in the UK on 22-24 June.