Skip to main content

Versatile truck-mounted compact crane

Cargotec believe companies operating in emerging markets will benefit greatly from using its new compact unit suited for mounting on light trucks. The Hiab ST 080 (stiff and telescopic) concept was developed to meet the need for a crane with good hoisting properties, a low weight and long lifetime.
March 15, 2012 Read time: 2 mins
3335 Cargotec believe companies operating in emerging markets will benefit greatly from using its new compact unit suited for mounting on light trucks.

The Hiab ST 080 (stiff and telescopic) concept was developed to meet the need for a crane with good hoisting properties, a low weight and long lifetime. The new model features a boom with a hexagonal profile and is available with two or three extensions.

The ST 083-032 has two extensions and a horizontal outreach of 7.8m, while the ST 084-032 has three extensions and a horizontal outreach of 10.1m and the ST 080 models offer a maximum lifting capacity on the hook of 3.2tonnes.

Said to offer easy use, high productivity and smooth operation, the Hiab ST 080 and other ST cranes feature cross controls that allow a truck driver to operate the crane from either side of a truck.

Other features of the ST 080 include a strong hoisting mechanism, combined with large wire drums and reliable load handling while minimising time spent on loading and unloading. A powerful gearbox provides high hoisting speed at low noise levels. The ST 080 is said by Cargotec to be made of high quality materials with various built-in and well-protected components.

For more information on companies in this article

Related Content

  • Indian quarry boosts wear life and output
    June 20, 2016
    An Indian quarry facility has seen increased uptime and gains in overall efficiency due to the installation of new wear components in its crushing system Installing new distributor plates in this Indian granite quarry has increased its plate operational lifetime by 400-500%. Panchami Stone has fitted the unique HX900 plates to the 85 HP rotor of its Sandvik Construction CV218 VSI, reducing its replacement costs by 50%. The Panchami Stone granite quarry is located 60km from Bangalore, in the south of I
  • Brazilian contractor uses novel methods for high quality road
    January 5, 2015
    Cold-in place recycling method provides fast road rebuild in Brazil In Brazil a road contractor has carried out a high quality road rebuilding job, using novel techniques. Contractor Brown Brown is located in Santa Teresinha in the state of Bahia and recently carried out a two-week job for the company to rehabilitate sections of highway BR-381. The highway is an important route in Brazil and runs from Sao Paulo to Belo Horizonte. Highway BR-381 or Rodovia Fernão Dias, as it is called, stretches some 576km
  • Golden route to success
    July 20, 2012
    Built in 1937 and still the ninth longest suspension bridge in the world, the Golden Gate Bridge across San Francisco Bay remains in fine shape despite its age - Andrew Bardin Williams writes The Golden Gate Bridge turned 75 years old on May 27 and continues to play a key role in the transportation, engineering, construction and ITS communities. The structure has played an important historical role, an engineering success that boosted the economy of the region. And it also led the way as the first major pub
  • Kuwait’s key causeway contract under construction
    July 4, 2016
    A new causeway, crossing the Bay of Kuwait, is under construction and providing a major engineering challenge - Mike Woof reports. The new Sheikh Jaber Al-Ahmad Al-Sabah Causeway Project being built across the Bay of Kuwait is a massive engineering project that is costing around US$3 billion in all. This highly complex project involves the design, build, completion and maintenance of the causeway, which spans Kuwait Bay between Kuwait City and the Subiyah area. The 36km Sheikh Jaber Al-Ahmad Al-Sabah Cau