Skip to main content

Versatile transport

The new NICE Mega City Enterprise electric van offers 800litres of load space, a top speed of 64km/h and a typical range of 64km. The vehicle suits use in urban areas and features two seats as well as zero-emissions. The MEGA City can be charged from domestic sockets at home, at work or at public charge points. These vehicles are aimed at use in cities such as London.
September 3, 2012 Read time: 1 min

The new NICE Mega City Enterprise electric van offers 800litres of load space, a top speed of 64km/h and a typical range of 64km. The vehicle suits use in urban areas and features two seats as well as zero-emissions. The MEGA City can be charged from domestic sockets at home, at work or at public charge points. These vehicles are aimed at use in cities such as London.

Related Content

  • Safer speeds required says new report
    June 18, 2018
    A new report highlights speeding as a significant factor in a worryingly high percentage of road crashes. According to the report, inappropriate speed is responsible for between 20% and 30% of all road crashes involving fatalities. The report is based on a review of research into the relationship between speed and crash risk and has been produced by the OECD’s International Transport Forum (ITF).
  • Hitachi wheel loader ZW5550-5 works in Lasa Marmo’s Whitewater quarry
    November 11, 2015
    The largest wheel loader in the Hitachi range has been delivered to Lasa Marmo’s Whitewater marble quarry near the village of Laas in northern Italy. The new ZW550-5’s main function is to lift each marble block that has been extracted from the cavernous site – situated 1,600m above sea level – and transport it through a series of passageways to an outdoor storage area. The ZW550-5 was delivered in December by Comac, a sub-dealer of the Italian Hitachi dealer for construction machinery, SCAI. The fuel
  • Material transfer vehicles see advances
    July 9, 2020
    Material transfer vehicles offer a buffer between asphalt trucks and pavers, optimising flow, and new models coming to market offer improved performance
  • Stockholm’s new bypass
    March 8, 2021
    Tunnels make up 18km of the 21km of the Swedish capital’s E4 Bypass mega-project. It will have taken 15 years from start to opening in 2030, if all goes well