Versatile screening buckets from Simex

Simex has designed its new VS 1500 screening bucket for separating materials of different sizes directly onsite and suits applications in demolition works.
May 4, 2022 Read time: 1 min
Simex is widening its range of screening buckets with the addition of new models

The new VS 1500 features two rotating shafts fitted with screening elements that are said to ensure efficient operation.

The screening system features disks and blades fixed to the shaft without welding. This cuts maintenance costs by up to 75% as the user can replace each disc or blade singly. Each element can be replaced in minutes onsite using a hammer and a punch. The system allows multiple configurations depending on the materials to be screened.

VS screening bucket is designed with the same quality and construction robustness of the firm’s larger VSE model.

For more information on companies in this article

Related Content

  • New array of earthmoving machines
    August 7, 2020
    Several firms are introducing new earthmoving machines with increased performance
  • Big excavators go ‘e’
    September 28, 2023
    These days, even those beasts of the construction site – excavators – have a date with sustainability, despite the huge amount of electric power needed to operate a machine that pushes about high loads of dirt.
  • Drum steer compactors introduced
    April 6, 2023
    One notable development at bauma 2022 was the introduction of new drum steer compactors by several key manufacturers
  • Tunnel construction benefits from improved visibility
    November 14, 2012
    Major new tunnel construction projects will, on completion, help secure more reliable journey times for hundreds of thousands of people across the world. Meanwhile, as Guy Woodford reports, leading ITS solution companies have been providing vital equipment for major road tunnels The Martina Tunnel Boring Machine (TBM), a 4,500tonne Herrenknecht Earth Pressure Balance Shield said to have a world record diameter of 15.55m, has required just under a year to build the first of two tunnel tubes for the 2.5km lon