Skip to main content

Versatile paving attachment from Mazio

Mazio is offering a versatile skid steer-mounted paver attachment for use in utility jobs. The firm says that the unit suits use on asphalt patching and paving of roads, pathways, bicycle tracks, parking lots, driveways, and utility trenches.
August 22, 2022 Read time: 1 min

 

With a 1.4m3 hopper capacity, a paving width of up to 1.9m, and a paving speed of 25m/minute, the firm’s SKID Paver can be installed on any type of skid steer loader. The unit works with hot or cold mix asphalt, paving asphalt thicknesses of 50-250mm. Liquid propane gas (LPG) heaters heat material to 140°C. The 2.75m-wide hopper receives asphalt material directly from the haul truck, allowing for front or side loading, and feeds to a 200mm auger. The retractable hydraulic screed allows the operator to work around obstacles. The SKID Paver can be operated forward and backward from the cab or via a wireless remote control. All functions operate hydraulically, including: auger; screed lifting, lowering, and telescopic positioning; and hopper opening/closing.

The 711kg SKID Paver unit features an adapter plate, control panel box and remote control, feeding auger, self-leveling system, screed heat system, and an optional vibrator. The hopper opens into two widths and folds for easy transport. The machine will also spread sand, gravel and stones, and concrete in flat layers, boosting versatility.

For more information on companies in this article

Related Content

  • Volvo machines help construct new Norwegian tunnels
    January 12, 2015
    Close to Larvik in Norway’s Vestfold County and around 80km south of Drammen, two tunnels are currently under construction as part of a state-funded infrastructure development programme. The project, which began earlier this year, comprises 7km of four lane highway – part of the E18 major route – linking the towns of Bommestad and Sky. This includes the new Larvik and Matineå tunnels, which will span 2.8 and 1.3km respectively. Worth €187 million, this project was awarded to Skanska Norway, the second la
  • Circuit of the Americas Formula for F1 success
    April 4, 2013
    In November 2012, the new Circuit of the Americas (COTA) in Austin, Texas, hosted the first ever Formula 1 US Grand Prix on a purpose-built track. But, as Jeff Winke and Guy Woodford report, the construction of COTA was just as demanding as competing in an F1 race itself For COTA construction contractor Austin Bridge & Road, L.P., nothing was more vital to the successful building of the 5.5km F1 track than meeting the strict criteria for its asphalt-paved surface. “The amount of stress this pavement will un
  • Hillhead promises industry showcase
    June 12, 2012
    Hillhead 2012, the three-day biennial flagship event for the quarrying, recycling and heavy construction industries, is set to be a sell-out. Guy Woodford looks at what a number of major companies will be exhibiting during the show being held next month at Buxton Quarry in Derbyshire With 400 exhibitors already confirmed Hillhead 2012, taking place 19-21 June, is set to draw bumper crowds and provide crucial new business opportunities for companies involved in quarrying, recycling and heavy construction. Ca
  • Lowering the carbon footprint of asphalt production
    September 28, 2023
    Advances in asphalt production will reduce carbon emissions and energy consumption.