Skip to main content

Velocity-Balfour Beatty tackling potholes

It is the bugbear of motorists worldwide, and costs UK councils alone an estimated US$82.12 million (£50 million) in compensation each year. Now Balfour Beatty is partnering with specialist supplier Velocity and North Somerset Council in south-west England to tackle potholes using innovative technology which vastly reduces disruption to road users. The method, called ‘Spray Injection’ patching, is allowing Balfour Beatty to repair nearly 700 potholes a week on its highways maintenance contract repairing
May 13, 2014 Read time: 3 mins
It is the bugbear of motorists worldwide, and costs UK councils alone an estimated US$82.12 million (£50 million) in compensation each year.

Now 1146 Balfour Beatty is partnering with specialist supplier Velocity and North Somerset Council in south-west England to tackle potholes using innovative technology which vastly reduces disruption to road users. The method, called ‘Spray Injection’ patching, is allowing Balfour Beatty to repair nearly 700 potholes a week on its highways maintenance contract repairing and upgrading North Somerset’s roads. The method is also being used on the company’s contract in Herefordshire and is being considered for roll-out to other highways maintenance operations.

The Velocity unit is a mobile mixing plant carrying high-grade road aggregate and bitumen emulsion which is controlled by the specialist operator. The first stage of the process has the defect cleaned and dried with warm air from the delivery hose. A bond coat is then sprayed into the cracks and crevices of the defect to seal and stop ingress of water to the road base then a controlled flow of fully coated aggregate is introduced to remove the defect. The repair is then compacted and swept.

Using this approach, potholes are said to be repaired in around three minutes, compared to up to an hour using more conventional methods. Costs are significantly lower, as is the environmental impact of repairing defects.

Steve Helliwell, operations director at Balfour Beatty Living Places said, “Repairing potholes is a major priority for us and our local authority clients. We understand that poor road conditions are a major frustration for motorists, as are delays caused by the essential work to repair and maintain the network.

“We’re very pleased with the performance of this technology, which is another important tool in our work to maintain the country’s highways. It allows us to carry out work quickly and safely, and also provides a better method of undertaking proactive preventative work to reduce surface deterioration.

“Of course, there is no single magic solution to potholes. But Balfour Beatty is committed to continuing to explore and deploy new methods where we think they will help to tackle this ongoing issue.”

Councillor Elfan Ap Rees, North Somerset Council’s executive member for highways, said, “We have been very pleased with the initial results of this innovative answer to pothole patching, which is enabling us to better keep pace with the problem across North Somerset, speeding up the process and allowing us to respond more quickly and efficiently to residents’ concerns.”

Phill Lewis, sales manager at Velocity, said, “Velocity is confident that the process is a cost-effective productive solution for the rural network.  By working closely with Balfour Beatty on preventative programmes of maintenance, we can stop further deterioration of the unclassified network, which sometimes receives less attention than larger roads.”

For more information on companies in this article

Related Content

  • Reduced emissions, costs, with recycled asphalt
    February 21, 2012
    Recycling is a key issue for asphalt road construction, with many technologies now coming to market. Bith an ever increasing emphasis on sustainability forcing change in the construction sector in Europe and North America, the highway sector now has to seek new solutions.
  • Balfour Beatty awarded €54.01 million A1 improvement scheme
    June 5, 2014
    Balfour Beatty has been awarded a €54.01 million (£43.9 million) contract to design and build the Highways Agency A1 Coal House to Metro Centre improvement scheme in Gateshead, north-east England. The project will include the introduction of new parallel link roads between the Lobley Hill and Gateshead Quay (A184) junctions and an increase in lane capacity on the A1 main line from two to three lanes in each direction from the Metro Centre to Coal House junction, a distance of 6.44kms.
  • Balfour Beatty wins major UK road repair contracts
    February 3, 2016
    Balfour Beatty is now working on a seven year, €323.94 million (£245 million) highways maintenance contract in the UK. This package of works is for Coventry City Council, Solihull Metropolitan Borough Council and Warwickshire County Council. There is an option to extend the contract for a further three years. Balfour Beatty Living Places will work in partnership with the three Councils. This collaborative arrangement in the local authority highways market will provide a single source service provider acr
  • Balfour Beatty Mott McDonald secure key H Agency contract
    June 15, 2012
    The Highways Agency has awarded the second of its new Asset Support Contracts to Balfour Beatty Mott MacDonald. The contract involves maintaining and improving the network of motorways and major ‘A’ roads in the North West. It will cover the Agency’s roads in Cheshire, Greater Manchester, Merseyside and south Lancashire and will go live from November 2012. Cumbria and the remainder of Lancashire are covered by a separate contract. The key contract will ensure motorways and major 'A' roads in the region co