Skip to main content

Under the wheels

A woman in New Zealand managed to run over her husband not once but twice in a short space of time. The woman was backing the couple's car from down their driveway when she ran over the unfortunate man. She then drove forward, running him over for the second time. An emergency response crew treated the man at the scene before taking him to hospital where he is recovering from his injuries. He suffered moderate injuries to his head, chest and back but was still conscious and able to talk to the ambulance cre
February 21, 2012 Read time: 1 min
A woman in New Zealand managed to run over her husband not once but twice in a short space of time. The woman was backing the couple's car from down their driveway when she ran over the unfortunate man. She then drove forward, running him over for the second time. An emergency response crew treated the man at the scene before taking him to hospital where he is recovering from his injuries. He suffered moderate injuries to his head, chest and back but was still conscious and able to talk to the ambulance crew. The police treated the incident as an accident and the woman was reported to be too distressed to give a statement afterwards.

Related Content

  • Driving Deficiencies
    November 20, 2014
    A multi-millionaire now has video evidence of his driving deficiencies following his performance during a race at the famous Monza track. The man struggled to control the high performance Ferrari, as he slid off the circuit and into the gravel traps placed on the curves for safety.
  • Major shift needed for micro-mobility
    September 18, 2020
    Consultancy Ramboll is calling for clear and standardised micro-mobility KPIs
  • Historic Oakland Bay Bridge receives a new asphalt road surface
    March 31, 2014
    Part of an iconic US bridge has been given a new lease of life, as Mike Woof reports The western section of the historic Oakland Bay Bridge in the US state of California has recently benefited from a series of improvements to strengthen its structural integrity and also upgrade the running surface. Contractor OC Jones & Sons of Berkeley CA, paved large portions of the bridge, taking on two different projects as part of the work. First was placement of the specialised epoxy on the self-anchored suspension (S
  • Sarens completes Nantes area A11 bridge lift
    December 27, 2023
    In France, Sarens used four Kamag SPMTs – self-propelled modular transporters – to move a bridge deck 70m and place it over the A11 at the autoroute’s Portes de Gesvres interchange.