Skip to main content

ULMA on the Guadiana Bridge

Heavy onsite winds and the simultaneous renovation of both pylons were challenges for ULMA when it supplied scaffolding for work on the Guadiana International Bridge
October 5, 2021 Read time: 2 mins
The 100m-high pylons of the Guadiana International Bridge were covered with ULMA’s BRIO Modular Scaffolding to facilitate the repair of suspension cables (image courtesy ULMA)

The cable-stayed structure crosses the Guadiana River to connect the Spanish town of Ayamonte and Portugal’s Vila Real de Santo António, both popular tourist destinations.

The 666m, 5-span heavily trafficked composite bridge was designed by the architects José Luis Cancio Martins and Teixeira Duarte and opened in 1991. The bridge – with a 334m central span - connects Portugal’s Via do Infante de Sagres A22 Motorway to Spain’s Autopista del Quinto Centenario A-49 Motorway and is part of the European Route E1.

Renovation work includes a major repair of suspension cables and large-scale structural and mechanical maintenance, as well as repaving of the road deck.

ULMA provisioned 460tonnes of formwork and scaffolding for the work.

The 100m-high pylons were covered with BRIO Modular Scaffolding and access stairways to creating many distinct access points to facilitate the repair of suspension cables. The scaffolding design had to accommodate the pylon geometry and the presence of the suspension cables, while providing safe working spaces. ULMA’s design was further complicated by the presence of strong winds onsite.

ULMA was required to provide an efficient and timely response to the project’s various demands, not least enough scaffolding to renovate pylons simultaneously.

Two protective gantries – one for each pylon – were installed in an extremely limited space so renovation could be undertaken without interrupting traffic flow. In order to adapt to the limited space available and withstand the load of the scaffolding structures, the gantries were made from heavy-duty T-500 Shoring Towers combined with intermediate metal beams and ENKOFORM.

See the Key project report on page 20 of this issue of World Highways for ULMA’s work on the Cebu–Cordova Link Expressway in the Philippines.

For more information on companies in this article

Related Content

  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    June 25, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering*. Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s
  • Mersey Gateway Bridge has won IABSE’s Outstanding Structure Award
    September 19, 2019
    The UK’s Mersey Gateway Bridge has picked up the Outstanding Structure Award 2019 from IABSE, the International Association for Bridge and Structural Engineering* Judges described the bridge, designed by Cowi, as "an elegantly integrated solution for a multi-span concrete cable stay bridge in which form follows function". "Everyone involved with the design and construction the Mersey Gateway Bridge over the past six years knows that this is an incredibly special structure,” said Paul Sanders, Cowi’s p
  • A new expressway link for the Philippines
    June 4, 2021
    Work continues on a new expressway link for the Philippines.
  • Mexico viaduct complete with ULMA formwork
    February 9, 2018
    ULMA developed a comprehensive solution for the construction project of the Interlomas Viaduct, México. Forming part of Mexico City’s transportation infrastructure development plan, this viaduct is 227m long and connects the residential and commercial area Interlomas with the Naucalpan-Toluca highway. ULMA designed a solution fully tailored to meet the pace and needs of the client: gantry falsework for two 59m outer spans, and a CVS Form Carrier for the central span of 108m. ULMA’s engineering team combi