Skip to main content

ULMA on the Guadiana Bridge

Heavy onsite winds and the simultaneous renovation of both pylons were challenges for ULMA when it supplied scaffolding for work on the Guadiana International Bridge
October 5, 2021 Read time: 2 mins
The 100m-high pylons of the Guadiana International Bridge were covered with ULMA’s BRIO Modular Scaffolding to facilitate the repair of suspension cables (image courtesy ULMA)

The cable-stayed structure crosses the Guadiana River to connect the Spanish town of Ayamonte and Portugal’s Vila Real de Santo António, both popular tourist destinations.

The 666m, 5-span heavily trafficked composite bridge was designed by the architects José Luis Cancio Martins and Teixeira Duarte and opened in 1991. The bridge – with a 334m central span - connects Portugal’s Via do Infante de Sagres A22 Motorway to Spain’s Autopista del Quinto Centenario A-49 Motorway and is part of the European Route E1.

Renovation work includes a major repair of suspension cables and large-scale structural and mechanical maintenance, as well as repaving of the road deck.

ULMA provisioned 460tonnes of formwork and scaffolding for the work.

The 100m-high pylons were covered with BRIO Modular Scaffolding and access stairways to creating many distinct access points to facilitate the repair of suspension cables. The scaffolding design had to accommodate the pylon geometry and the presence of the suspension cables, while providing safe working spaces. ULMA’s design was further complicated by the presence of strong winds onsite.

ULMA was required to provide an efficient and timely response to the project’s various demands, not least enough scaffolding to renovate pylons simultaneously.

Two protective gantries – one for each pylon – were installed in an extremely limited space so renovation could be undertaken without interrupting traffic flow. In order to adapt to the limited space available and withstand the load of the scaffolding structures, the gantries were made from heavy-duty T-500 Shoring Towers combined with intermediate metal beams and ENKOFORM.

See the Key project report on page 20 of this issue of World Highways for ULMA’s work on the Cebu–Cordova Link Expressway in the Philippines.

For more information on companies in this article

Related Content

  • Ulma launches the SBU platform
    July 6, 2016
    Ulma Construction said that it has designed the new SBU safety working platform to allow safe working with wall formwork at any height. The SBU is composed of modular scaffolding BRIO components that are certified under the European Standards EN 12810-1/2 and EN 12811-1/2/3, which provide for safe working spaces and structures. The modularity of BRIO scaffolding components allows the SBU galvanised metal platform to adapt seamlessly to diverse geometries. The corner platform offers full coverage even at
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap
  • ULMA bridges the Danube and Kayak rivers
    March 16, 2021
    The D4 motorway and R7 expressway project is Slovakia’s largest public-private partnership.
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.