The Tubeshor ATC contains a 450-tonne hydraulic cylinder coupled to a bladder accumulator which is pressurised to suit the individual prop design geo-load before dispatch

Altrad RMD Kwikform has launched a solution to reduce the effects of thermal loading - the Tubeshor Active Thermal Compensator, ATC.

The Tubeshor hybrid hydraulic shoring system is used for propping waler beams or capping beams of large excavations. Altrad RMD Kwikform, an above and below ground temporary works specialist, said it comes in a range of diameters to cater for all duties of shoring requirement.

An evolution of Tubeshor, the ATC Tubeshor accessory can reduce thermal loading by up to 90 percent compared to a mechanically locked-off prop, explained Ian Fryer, global product innovation director at Altrad RMD Kwikform.

Prop installation and pre-loading on site is carried out in the same way as for any standard proprietary prop; no special skills required. As Tubeshor ATC units are assembled directly into the prop makeup, standard prop end-fittings such as swivel units and spherical bearers can be used. Props can be installed into the excavation in the usual manner.

The Tubeshor ATC contains a 450-tonne hydraulic cylinder coupled to a bladder accumulator which is pressurised to suit the individual prop design geo-load before dispatch. Most of the time, the pressure in the accumulator exceeds that in the hydraulic system and normal prop stiffness results.

When higher temperature forces excessive prop thermal expansion, the compressed nitrogen in the accumulator comes into play and results in a phase of reduced prop stiffness. This means that a further increase in prop length resulting from thermal expansion does not result in the usual increase in prop load.

With less space taken up within the excavation, savings can be made on equipment, labour, transport and plant cost, as smaller plant can be used to install and remove the equipment.

Loads imposed on the permanent wall from the temporary props are reduced. This enables a lower cost wall design using less material and potentially reduces the volume of excavated soil, reducing project cost and further decreasing the carbon footprint.

The prop load can be read by direct inspection on site. There is also an option to use e-pins and wireless nodes to provide continuous prop load monitoring and data logging via a smartphone, tablet or laptop.
 

For more information on companies in this article

Related Content

  • Advances in concrete paving materials
    July 9, 2012
    Innovations in materials technology, as well as machines, could provide a major boost to the concrete paving sector - Mike Woof reports Development of new material technologies for the concrete paving sector continues apace and the latest innovations could provide the biggest boost for this market in many years. High performance cementitious material (HPCM) is an innovative concept that has been developed and tested for road surfacing applications as part of a project in which the UK's Transport Research La
  • Thinking compaction
    October 1, 2024
    Sophisticated compaction technology is proving it worth to speed road construction.
  • Rapidmix enables re-use of waste fines for Gallagher Group
    May 23, 2016
    Rapid International has supplied the Gallagher Group, based in the UK, with a new Rapidmix 400CW mobile continuous mixing plant. The Rapidmix machine is operated primarily at the group’s Hermitage Quarry site and is transported to site if haulage presents an issue. Gallagher Group, in the south-east county of Kent, is a building, civil engineering, aggregates and property development company. The group has already purchased a 3m3 Rapid pan mixer for installation in a concrete batching plant system.
  • Rapidmix enables re-use of waste fines for Gallagher Group
    May 23, 2016
    Rapid International has supplied the Gallagher Group, based in the UK, with a new Rapidmix 400CW mobile continuous mixing plant. The Rapidmix machine is operated primarily at the group’s Hermitage Quarry site and is transported to site if haulage presents an issue. Gallagher Group, in the south-east county of Kent, is a building, civil engineering, aggregates and property development company. The group has already purchased a 3m3 Rapid pan mixer for installation in a concrete batching plant system.