Skip to main content

Tubeshor shoring system

By David Arminas December 10, 2024 Read time: 2 mins
The Tubeshor ATC contains a 450-tonne hydraulic cylinder coupled to a bladder accumulator which is pressurised to suit the individual prop design geo-load before dispatch

Altrad RMD Kwikform has launched a solution to reduce the effects of thermal loading - the Tubeshor Active Thermal Compensator, ATC.

The Tubeshor hybrid hydraulic shoring system is used for propping waler beams or capping beams of large excavations. Altrad RMD Kwikform, an above and below ground temporary works specialist, said it comes in a range of diameters to cater for all duties of shoring requirement.

An evolution of Tubeshor, the ATC Tubeshor accessory can reduce thermal loading by up to 90 percent compared to a mechanically locked-off prop, explained Ian Fryer, global product innovation director at Altrad RMD Kwikform.

Prop installation and pre-loading on site is carried out in the same way as for any standard proprietary prop; no special skills required. As Tubeshor ATC units are assembled directly into the prop makeup, standard prop end-fittings such as swivel units and spherical bearers can be used. Props can be installed into the excavation in the usual manner.

The Tubeshor ATC contains a 450-tonne hydraulic cylinder coupled to a bladder accumulator which is pressurised to suit the individual prop design geo-load before dispatch. Most of the time, the pressure in the accumulator exceeds that in the hydraulic system and normal prop stiffness results.

When higher temperature forces excessive prop thermal expansion, the compressed nitrogen in the accumulator comes into play and results in a phase of reduced prop stiffness. This means that a further increase in prop length resulting from thermal expansion does not result in the usual increase in prop load.

With less space taken up within the excavation, savings can be made on equipment, labour, transport and plant cost, as smaller plant can be used to install and remove the equipment.

Loads imposed on the permanent wall from the temporary props are reduced. This enables a lower cost wall design using less material and potentially reduces the volume of excavated soil, reducing project cost and further decreasing the carbon footprint.

The prop load can be read by direct inspection on site. There is also an option to use e-pins and wireless nodes to provide continuous prop load monitoring and data logging via a smartphone, tablet or laptop.
 

For more information on companies in this article

Related Content

  • Versatile lance from Auquajet
    February 3, 2020
    The Super Lance 3000 replaces the previous lance and allows contractors to use a single lance for any pressure up to 3,000bar.
  • Major improvements for wheeled loaders and excavators
    April 24, 2013
    Excavators and wheeled loaders benefit from new engine technology - Mike Woof reports. Competition is tough in the market for crawler excavators and wheeled loaders. These production machines account for a significant percentage of the entire construction equipment market worldwide and the segment also has the widest array of competing manufacturers. In the past, European, Japanese and US manufacturers dominated this sector but in the last 20 years South Korean companies have built significant market shares
  • Drilling efficiency
    April 13, 2012
    The latest developments in drilling rigs can help boost efficiency in quarry producion applications - Mike Woof reports. Efficient drilling and blasting operations can have a huge impact on production costs in quarrying. Accuracy of hole direction and depth, as well as optimum blast design and explosives use, are critical for efficient blasting work. Ineffective blasting can result in high quantities of fines of low commercial value as well as over-sized material requiring secondary breaking. This impacts o
  • Drilling efficiency
    February 20, 2012
    The latest developments in drilling rigs can help boost efficiency in quarry producion applications - Mike Woof reports