Skip to main content

Trimble offering sophisticated package of solutions

Trimble says that its latest Connected Site solutions offer improved efficiency for connecting workers, machines and projects across the planning, design and construction lifecycle. These technologies suit use by heavy civil contactors and site preparation contractors. Trimble’s mix of hardware, software and mobility technologies streamlines communication and collaboration throughout the construction lifecycle, from planning, design and site preparation through to the finished project. Connecting people
February 2, 2015 Read time: 3 mins
Trimble’s connected site offers greater efficiency
2122 Trimble says that its latest Connected Site solutions offer improved efficiency for connecting workers, machines and projects across the planning, design and construction lifecycle. These technologies suit use by heavy civil contactors and site preparation contractors.

Trimble’s mix of hardware, software and mobility technologies streamlines communication and collaboration throughout the construction lifecycle, from planning, design and site preparation through to the finished project. Connecting people, machines and projects delivers real-time data to contractors and project stakeholders for enhanced information about material, people and asset utilization, resulting in improved productivity.

The latest capabilities provide now deliver greater quantities of accurate real-time information and data in the field, in the office and throughout the project. Boosting the information flow is said to enable contractors to achieve faster project completion with reduced costs, improved safety and lower environmental impact according to Trimble.

These solutions can improve the workflows of grading and excavating contractors, paving contractors, drilling and piling contractors, and site and utility contractors. The Connected Worker allows users to wirelessly synchronise data in the field with the office and receive GNSS corrections via the Internet. A grade checker, construction surveyor, supervisor and other field personnel can receive the 3D constructible design model, generate new measurements and send the measurement and stakeout results back to the office for review. Design changes originating in the office can be sent to field crews so they are updated with current information.

The Connected Machine offering is now standard in all Trimble Grade Control Systems and helps contractors manage assets and see what machines are doing. Machines can collect as-built measurement data for office delivery, and receive GNSS corrections using the Internet. A 3D constructible model created in the office can be sent to the machine operator for faster, more precise grading and earthmoving. The machine can be used for volume measurements, so expensive measurements by grade checkers occur less frequently.

With the Connected Project, contractors to build 3D construction models, perform data preparation and take-off, wirelessly synchronise data, monitor site productivity, and manage fleets and assets. The 3D design model can be sent to machines and controllers in the field, increasing efficiency, reducing rework and saving money. Additionally, a complete view of site productivity including materials quantity and movement, volume and compaction data, and fleet and asset management information can be shared across the organisation for better decision-making and communications.

For more information on companies in this article

Related Content

  • Topcon’s LN-100 3D positioning system
    May 13, 2014
    Topcon Positioning Group says its new BIM solution - the LN-100 – is the world’s first 3D positioning system designed specifically for construction layout. Said to offer seamless integration and flow of project data from the design to the field, the LN-100 is simple to operate, removing “the intimidation factor and reducing the learning curve in performing construction layout tasks,” according to Eduardo Falcon, Topcon Positioning Group executive vice president and general manager for the GeoPositioning
  • Case CE unveils new fleet management system
    January 6, 2017
    Case Construction Equipment has launched SiteWatch, its new fleet management tool, at bauma 2013. Through its ability to accurately measure operating performance customers can, according to Case, use SiteWatch to increase productivity, boost utilisation and keep on top of fleet maintenance issues. With programmed maintenance plans, the operator has the option of leaving the service and maintenance requirement to their Case dealer.
  • Case CE unveils new fleet management system
    April 16, 2013
    Case Construction Equipment has launched SiteWatch, its new fleet management tool, at bauma 2013. Through its ability to accurately measure operating performance customers can, according to Case, use SiteWatch to increase productivity, boost utilisation and keep on top of fleet maintenance issues. With programmed maintenance plans, the operator has the option of leaving the service and maintenance requirement to their Case dealer.
  • Smart system for recording road repairs
    May 25, 2016
    The new Site-Track system is said to offer a sophisticated tool for tracking road repairs. The system can be used for identifying new installation or repairs for utilities and recording all utilities in the immediate area of the installation. The package offers a method of relocating previously recorded information rapidly, without the need for advanced skills or technologies such as GPS and is said to be invaluable for night-time or emergency works. The package can provide accurate location of critica