Skip to main content

Trimble offering sophisticated package of solutions

Trimble says that its latest Connected Site solutions offer improved efficiency for connecting workers, machines and projects across the planning, design and construction lifecycle. These technologies suit use by heavy civil contactors and site preparation contractors. Trimble’s mix of hardware, software and mobility technologies streamlines communication and collaboration throughout the construction lifecycle, from planning, design and site preparation through to the finished project. Connecting people
January 6, 2017 Read time: 3 mins
Trimble’s connected site offers greater efficiency
2122 Trimble says that its latest Connected Site solutions offer improved efficiency for connecting workers, machines and projects across the planning, design and construction lifecycle. These technologies suit use by heavy civil contactors and site preparation contractors.

Trimble’s mix of hardware, software and mobility technologies streamlines communication and collaboration throughout the construction lifecycle, from planning, design and site preparation through to the finished project. Connecting people, machines and projects delivers real-time data to contractors and project stakeholders for enhanced information about material, people and asset utilization, resulting in improved productivity.

The latest capabilities provide now deliver greater quantities of accurate real-time information and data in the field, in the office and throughout the project. Boosting the information flow is said to enable contractors to achieve faster project completion with reduced costs, improved safety and lower environmental impact according to Trimble.

These solutions can improve the workflows of grading and excavating contractors, paving contractors, drilling and piling contractors, and site and utility contractors. The Connected Worker allows users to wirelessly synchronise data in the field with the office and receive GNSS corrections via the Internet. A grade checker, construction surveyor, supervisor and other field personnel can receive the 3D constructible design model, generate new measurements and send the measurement and stakeout results back to the office for review. Design changes originating in the office can be sent to field crews so they are updated with current information.

The Connected Machine offering is now standard in all Trimble Grade Control Systems and helps contractors manage assets and see what machines are doing. Machines can collect as-built measurement data for office delivery, and receive GNSS corrections using the Internet. A 3D constructible model created in the office can be sent to the machine operator for faster, more precise grading and earthmoving. The machine can be used for volume measurements, so expensive measurements by grade checkers occur less frequently.

With the Connected Project, contractors to build 3D construction models, perform data preparation and take-off, wirelessly synchronise data, monitor site productivity, and manage fleets and assets. The 3D design model can be sent to machines and controllers in the field, increasing efficiency, reducing rework and saving money. Additionally, a complete view of site productivity including materials quantity and movement, volume and compaction data, and fleet and asset management information can be shared across the organisation for better decision-making and communications.

For more information on companies in this article

Related Content

  • Trimble’s innovative technology at Conexpo 2014
    January 17, 2014
    The Trimble Quantm alignment planning system allows road designers to reduce planning time and deliver projects with minimal environmental and social impact at a lower construction and operating cost. The system, on show at Conexpo 2014, analyses millions of alignment alternatives and returns a range of options to the planning team for consideration. When new data becomes available the Quantm system can quickly recalculate more alignment options.
  • Paving Control Platform from Trimble
    May 27, 2022
    Users of Trimble’s Roadworks Paving Control Platform can transfer 3D designs wirelessly from the office to the machine.
  • Airport expansion for the Maldives assisted by Trimble
    September 6, 2019
    An airport redevelopment and expansion project in the Maldives has been assisted by the use of technology from Trimble. In 2016 the Chinese firm Beijing Urban Construction Group (BUCG) was awarded the contract for the expansion of the Ibrahim Nasir International Airport on Hulhule island in the Maldives, which is part of the Indian Ocean island group. The massive US$440 million expansion and land reclamation work is intended to boost capacity at the Maldives Airport. BUCG has utilised Trimble field solu
  • Lima's massive $2 billion airport project
    March 4, 2025
    Peru’s capital, Lima, is to benefit from a massive new international airport, which will be one of the largest in Latin America – Mike Woof writes