Skip to main content

Trimble LOADRITE connects quarries like never before

A new Trimble LOADRITE product is connecting quarries like never before, helping to find both immediate gains and long-term solutions. The new LOADRITE product, InsightHQ: The Connected Quarry, tracks three core areas: extraction, processing and load out, said John Vaassen, regional manager with Trimble LOADRITE. Tracking those main business drivers helps provide information crucial to the decision-making process. That applies to short-term challenges, such as prioritising trucking, to long-term decisions
April 23, 2015 Read time: 2 mins
Trimble’s LOADRITE technology connects data from every phase of a quarry site.
A new 2122 Trimble 5004 LOADRITE product is connecting quarries like never before, helping to find both immediate gains and long-term solutions.

The new LOADRITE product, InsightHQ: The Connected Quarry, tracks three core areas: extraction, processing and load out, said John Vaassen, regional manager with Trimble LOADRITE. Tracking those main business drivers helps provide information crucial to the decision-making process. That applies to short-term challenges, such as prioritising trucking, to long-term decisions including equipment purchases.

The data – available at fixed and mobile locations – provides efficiencies in the individual areas while also delivering a complete picture, Vaassen said. “It’s truly a system that benefits the entire site.”

Finding an efficiency in one area leads to gains in others, Vaassen said. He offered an example where the technology created an immediate 18% gain by optimising haulage from 36 to 42tonnes per cycle. “Through continuous improvements, they eventually were able to increase their loading to 66tonnes per cycle,” Vaassen said.

Implementation of the system is easy, he said. “All members of the operation can easily learn how to use it. Everyone can see it every day. It makes the information more relevant. It’s not just the wheel loader operator or the management.”

For more information on companies in this article

Related Content

  • THIS is a Paving Project– The I-15 CORE
    December 20, 2012
    Provo, Utah – The scope of the I-15 Corridor Expansion Project (I-15 CORE) in the state of Utah is nearly unprecedented because of the size of the project and the short completion deadline. Twenty-four miles (38.6 km) of removal and replacement of Interstate 15 between Lehi and Spanish Fork, widening the number of traveling lanes by two, for up to six lanes in each direction in 35 months. The new 364 lane miles (586 km) of concrete roadway will be slipformed 12 or 12.5 inches (305 or 318 mm) thick for a tot
  • Efficient stockpile and site monitoring
    October 23, 2017
    Effective monitoring of aggregates stockpiles as well as face excavation can deliver greater quarrying efficiency. One of the latest innovations in quarrying is the use of drones, which provide major benefits for optimising operations. The use of affordable drone hardware and software solutions can help reduce stockpile inventory time by as much as 70%. Through the recent partnership between Trimble and Propeller, drone data can now be an everyday tool in quarries by proving a transformational impact
  • Astec Industries CEO and president Ben Brock says stay focused and true to win
    July 8, 2016
    Core values, constant innovation and looking after the customer are the key drivers for Ben Brock, chief executive officer and president of Astec Industries. How does he keep his company ahead of the pack and what does he think that the future holds? if you ask Ben Brock to explain how his Astec Industries group has managed to do so well for so long, he doesn’t even pause for breath. “That’s easy, I thank the good doctor. He always told me: do good work and take care of the customer ... which is exactl
  • Western Sydney Airport Bulk Earthworks
    November 7, 2023
    The massive Bulk Earthworks project, under development by the federal government-owned Western Sydney Airport (WSA), entails construction of an international airport on the western side of Sydney, Australia.