Skip to main content

Trimble DPS900 Drilling and Piling System

Trimble has introduced the Trimble DPS900 Drilling and Piling System, a new machine control solution for drilling and piling contractors. Part of the Trimble Connected Site portfolio, the new DPS900 system enables contractors to perform drilling and piling operations quickly, safely and accurately. The new system can also help promote jobsite safety by minimising the need for stakes, construction surveying and personnel near the machine during drilling operations. The DPS900 system gives contractors
August 27, 2013 Read time: 2 mins
Trimble’s DPS900 Drilling and Piling system gives contractors the ability to precisely drill to the specified location, depth, orientation and inclination angle

Trimble has introduced the Trimble DPS900 Drilling and Piling System, a new machine control solution for drilling and piling contractors.

Part of the 2122 Trimble Connected Site portfolio, the new DPS900 system enables contractors to perform drilling and piling operations quickly, safely and accurately.

The new system can also help promote jobsite safety by minimising the need for stakes, construction surveying and personnel near the machine during drilling operations. The DPS900 system gives contractors the ability to precisely drill to the specified location, depth, orientation and inclination angle. Better rock fragmentation and minimised hauling costs are said by Trimble to be achievable by optimising drill hole spacing, angles and the location of the machine for a more even pattern of blasting. Reduced overdrilling means machine bits and hammers last longer, which can result in significant cost savings. In addition, machines can operate 24 hours a day, 7 days a week in almost any conditions so delays due to darkness or bad weather are minimised.

“The system is so easy to use, an experienced drill operator can become proficient in typically 30 minutes,” said Alan Sharp, business area director of Trimble Software Solutions and Specialist Construction Systems. “Engineered for ease of use, Trimble DPS900 features streamlined drilling and piling workflows and an intuitive user interface designed for construction environments.”

The integration of Trimble Business Center – HCE in the office and DPS900 in the field can increase efficiency and productivity of drilling and piling operations, says Trimble. Beginning with accurate job estimating and takeoff, drilling and piling contractors can have more confidence in their estimates by using Business Center – HCE office software. Once production begins, the new Business Center – HCE Drilling and Piling module offers contractors tools to rapidly create optimised drilling and piling plans. The drill plan is then wirelessly synced to the DPS900 system in the field, eliminating the need to drive to the site. To complete the project lifecycle, Business Center – HCE can be used for comprehensive quality and production reporting.

The new Trimble DPS900 Drilling and Piling System and Business Center – HCE v2.8 were due to be available in the third quarter of 2013 through Trimble’s SITECH Technology Dealer Channel.

For more information on companies in this article

Related Content

  • Software tools aid construction, reduce costs
    February 28, 2012
    Integrated construction software offers an effective planning solution - *Mark Nichols writes. In a world where resources are limited, 20 year designing and building in a sustainable way is more critical than ever. By employing today's software tools it is possible to reduce the total cost of construction of a new highway, while reducing operating costs and environmental impacts. The path to achieving the greatest gains is to take a holistic approach to the plan, design, construct and operate process from t
  • Machine Control sector is the place for acquisitions
    January 22, 2014
    The machine control sector has been lively in recent months with a major acquisition, the unveiling of new software innovation and landmark testing of new technology to monitor paving temperature. Guy Woodford reports The state road construction authority in the German state of Saxony-Anhalt (LSBB Saxony-Anhalt) has become the first nationally to test MOBA’s new PAVE-IR Scan temperature measurement system at a works site.
  • Helsinki's tunnel project
    April 11, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un
  • Helsinki's tunnel project
    May 9, 2012
    A novel approach to utilities installation will lengthen the life of Helsinki's streets, reports Mike Woof. A major utilities project in Finnish capital Helsinki will offer huge benefits for the city's streets and traffic flow rates in years to come. A new tunnel system is being excavated under Helsinki for the power company Helsingin Energia, although this will be co-owned by the city. Called the Common Utility Tunnel (Meilahti-Pasilak-Käpylä LU2), the excavations form an extensive network spreading out un