Skip to main content

Trimble DPS900 Drilling and Piling System

Trimble has introduced the Trimble DPS900 Drilling and Piling System, a new machine control solution for drilling and piling contractors. Part of the Trimble Connected Site portfolio, the new DPS900 system enables contractors to perform drilling and piling operations quickly, safely and accurately. The new system can also help promote jobsite safety by minimising the need for stakes, construction surveying and personnel near the machine during drilling operations. The DPS900 system gives contractors
August 27, 2013 Read time: 2 mins
Trimble’s DPS900 Drilling and Piling system gives contractors the ability to precisely drill to the specified location, depth, orientation and inclination angle

Trimble has introduced the Trimble DPS900 Drilling and Piling System, a new machine control solution for drilling and piling contractors.

Part of the 2122 Trimble Connected Site portfolio, the new DPS900 system enables contractors to perform drilling and piling operations quickly, safely and accurately.

The new system can also help promote jobsite safety by minimising the need for stakes, construction surveying and personnel near the machine during drilling operations. The DPS900 system gives contractors the ability to precisely drill to the specified location, depth, orientation and inclination angle. Better rock fragmentation and minimised hauling costs are said by Trimble to be achievable by optimising drill hole spacing, angles and the location of the machine for a more even pattern of blasting. Reduced overdrilling means machine bits and hammers last longer, which can result in significant cost savings. In addition, machines can operate 24 hours a day, 7 days a week in almost any conditions so delays due to darkness or bad weather are minimised.

“The system is so easy to use, an experienced drill operator can become proficient in typically 30 minutes,” said Alan Sharp, business area director of Trimble Software Solutions and Specialist Construction Systems. “Engineered for ease of use, Trimble DPS900 features streamlined drilling and piling workflows and an intuitive user interface designed for construction environments.”

The integration of Trimble Business Center – HCE in the office and DPS900 in the field can increase efficiency and productivity of drilling and piling operations, says Trimble. Beginning with accurate job estimating and takeoff, drilling and piling contractors can have more confidence in their estimates by using Business Center – HCE office software. Once production begins, the new Business Center – HCE Drilling and Piling module offers contractors tools to rapidly create optimised drilling and piling plans. The drill plan is then wirelessly synced to the DPS900 system in the field, eliminating the need to drive to the site. To complete the project lifecycle, Business Center – HCE can be used for comprehensive quality and production reporting.

The new Trimble DPS900 Drilling and Piling System and Business Center – HCE v2.8 were due to be available in the third quarter of 2013 through Trimble’s SITECH Technology Dealer Channel.

For more information on companies in this article

Related Content

  • Trimble’s new tools can boost drilling, piling and bucket weighing accuracy
    November 29, 2013
    Trimble is broadening its range of products with the introduction of its new DPS900 Drilling and Piling System and Business Center and the LOADRITE X2350 Payload Management System for excavators. According to the firm, the DPS900 Drilling and Piling system allows contractors to drill precisely at a specified location, to preset levels for depth, orientation and inclination angle. The HCE Drilling and Piling module is said to offer contractors tools to create optimised drilling and piling plans that can help
  • Piling accurately with Trimble’s new tool
    June 10, 2019
    Trimble is offering a new system that can help to boost the quality of drilling and piling work. The firm’s new Groundworks Machine Control System has been developed as a streamlined machine control solution for drilling and piling operations that helps optimise productivity and quality. The firm claims that this highly sophisticated system allows contractors to carry out drilling and piling operations more quickly, safely and accurately than using conventional methods. “Engineered for ease of use, Trim
  • Trimble’s new package boosts piling accuracy; productivity
    October 1, 2014
    Trimble is now offering a dedicated, land-based 3D machine control system for use with a variety of piling machine makes and models. The DPS900 Piling System is said to boost accuracy and allows piling contractors to increase efficiency, taking over from less accurate manual alignment techniques that also take more time for set-up procedures and increase the risk of errors. The firm says that the DPS900 system means contractors can take advantage of accurate positioning and automated reporting to ensure
  • Trimble’s GCS900 3D system makes the grade with Bobcat
    November 20, 2015
    Trimble’s GCS900 3D system for grade control is now available as an upgrade from the 2D laser-guided and sonic/slope systems already offered by Bobcat. The Trimble GCS900 is extremely flexible and can be used on excavators, dozers, motor graders, compactors, scrapers, trimmers, and milling machines. The GSC900 cab be used both as a single unit, or as an upgrade from a GCS600 Grade Control System.