Skip to main content

Tracto-Technik’s the wa-ter go

Sub-contractors used equipment from Tracto- Technik to renew two sections of an old grey cast iron water transport pipe covering a total of 200m as part of a complete street restructure in Linz, Austria. In order to prevent any traffic chaos and potential loss of trade for shopkeepers on busy Haidfield Street, while, at the same time, ensuring that the pipe cross-section ND 400 and the hydraulic pipe remained intact, Linz AG Water Department sub-contractors Swietelski- Faber (SF) decided to apply the static
October 31, 2012 Read time: 2 mins
Sub-contractors used equipment from Tracto- Technik to renew two sections of an old grey cast iron water transport pipe covering a total of 200m as part of a complete street restructure in Linz, Austria.

In order to prevent any traffic chaos and potential loss of trade for shopkeepers on busy Haidfield Street, while, at the same time, ensuring that the pipe cross-section ND 400 and the hydraulic pipe remained intact, Linz AG Water Department sub-contractors Swietelski- Faber (SF) decided to apply the static pipe bursting method to renew the pipes in three days over a recent weekend.

Using this method, pipes with the same size or larger pipes can be renewed in the same bore path. It is unusual to replace an old cast iron pipe with a new cast iron pipe of the same nominal size with the trenchless method, but it is possible and common with the pipe bursting method without any restrictions.

In order to burst the old cast iron pipe, to expand the bore channel and at the same time pull in the Duktus manufactured ductile iron pipe ND 400, obtaining a machine technology with tensile strengths was said to be crucial to SF’s chances of meeting its tight working deadline. A further requirement was the task of measuring and documenting the tensile strengths, as the pipes were only allowed to be strained up to 650 kN.

As a result, SF used 2738 Tracto-Technik’s (TT) GRUNDOBURST Type 1900 G with 1900 kN tensile strength pipe bursting system and the tensile strength measuring device GRUNDOLOG.

The measured and documented tensile forces were 500 kN, well below the permitted strains for the connection of the new pipe.

TT said the “exemplary co-operation” of all the companies involved in the project enabled the on-time completion of what was said to be one of the largest static pipe bursting method jobsite works ever undertaken in Austria.

For more information on companies in this article

Related Content

  • Wirtgen: low-emission recycling near Legoland
    March 22, 2024
    Wirtgen, Vögele and Hamm were on a section of the busy E45 highway close to the famous Legoland resort at Billlund, Denmark.
  • Formwork solutions for bridge maintenance and repair
    January 6, 2015
    An array of innovative formwork solutions have helped in the repair and construction of key bridge links - Mike Woof writes Formwork producers are continually developing novel solutions for bridge maintenance and construction applications. Several key structures have benefited from the novel use of formwork systems, with suppliers such as Doka, PERI, Pilosio and RMD all working on important structures in recent times. In Estonia, construction work is underway on the bypass around Tartu, the country’s
  • A flexible approach to concrete testing
    February 20, 2012
    One of the world's most versatile building materials is subject to a variety of tests to make sure it is fit for purpose. Patrick Smith reports
  • Researchers trial 3D printing for both concrete and asphalt roads
    February 27, 2019
    Automated road repairs, using 3D printing, could save money and vastly reduce disruption, and researchers are already showing it’s possible - Kristina Smith reports It’s the middle of the night, and in the street below a team is busy carrying out repairs to the road surface. But there isn’t a human in sight. A road repair drone has landed at the site of a crack and a 3D asphalt printer is now busy filling in that crack. A group of traffic cone drones have positioned themselves around the repair location