Skip to main content

On track with Peri’s new VCT Composite Track

By David Arminas June 19, 2025 Read time: 1 min
The VCT Composite Track system is already being used in Croatia and for construction of the new Thulba viaduct in Germany

Building steel composite bridges faster and with higher quality concrete carriageway slabs is possible with PERI’s new VCT Composite Track.

The system is already being used in Croatia and for construction of the new Thulba viaduct in Germany. Visitors will see a replica of the impressive project in the PERI exhibition hall. The composite track has also been named as a finalist for the bauma innovation award in the construction sector.

The VTC Tunnel Formwork Carriage and the SB Brace Frame facilitate shuttering and striking processes through the use of hydraulic units and can be moved automatically, which speeds up and simplifies tunnel construction processes considerably.

Peri’s portfolio for tunnel construction has been expanded to include special engineering solutions and customised special machines, which includes KERN Tunneltechnik.

For more information on companies in this article

Related Content

  • Versatile small construction equipment
    February 9, 2012
    Smaller construction equipment offers versatile options, particularly on highway repair and maintenance projects. Patrick Smith reports. Visitors to any highway construction site across the world will see a sizeable amount of utility equipment in action carrying out a variety of tasks. Indeed, because of its smaller, more compact size, such multi-task equipment is essential when repair and maintenance projects are being carried out, particularly in urban areas where space may be limited.
  • Sennebogen builds its largest duty cycle crawler crane, the 6300
    March 14, 2016
    Sennebogen has begun production of a 300tonne duty cycle crawler crane, the 6300, in its home German state of Bavaria. Assembly of the first one - the largest ever Sennebogen duty cycle crawler crane - began in Straubing at the end of last year in an expanded production facility. “Every part has been designed for maximum durability,” said managing director Erich Sennebogen. “The base frame is solid steel to absorb forces during continuous use and we also spared no expense in high-quality, solid compo
  • Sennebogen builds its largest duty cycle crawler crane, the 6300
    January 6, 2017
    Sennebogen has begun production of a 300tonne duty cycle crawler crane, the 6300, in its home German state of Bavaria. Assembly of the first one - the largest ever Sennebogen duty cycle crawler crane - began in Straubing at the end of last year in an expanded production facility. “Every part has been designed for maximum durability,” said managing director Erich Sennebogen. “The base frame is solid steel to absorb forces during continuous use and we also spared no expense in high-quality, solid compo
  • Maybe Hire takes on Whorlton Bridge
    March 14, 2025
    For refurbishment of the old English bridge, a temporary cable crane structure - designed by CaSE Civil & Structural Engineering - used a range of Mabey Hire’s propping equipment, including the Mass 50, System 160 and Mat 125 products.