Skip to main content

On track with Peri’s new VCT Composite Track

By David Arminas June 19, 2025 Read time: 1 min
The VCT Composite Track system is already being used in Croatia and for construction of the new Thulba viaduct in Germany

Building steel composite bridges faster and with higher quality concrete carriageway slabs is possible with PERI’s new VCT Composite Track.

The system is already being used in Croatia and for construction of the new Thulba viaduct in Germany. Visitors will see a replica of the impressive project in the PERI exhibition hall. The composite track has also been named as a finalist for the bauma innovation award in the construction sector.

The VTC Tunnel Formwork Carriage and the SB Brace Frame facilitate shuttering and striking processes through the use of hydraulic units and can be moved automatically, which speeds up and simplifies tunnel construction processes considerably.

Peri’s portfolio for tunnel construction has been expanded to include special engineering solutions and customised special machines, which includes KERN Tunneltechnik.

For more information on companies in this article

Related Content

  • Doka showcases Cut&Cover tunnel construction solution
    January 6, 2017
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Doka showcases Cut&Cover tunnel construction solution
    February 7, 2013
    Austrian firm Doka will be showcasing at bauma its first system to be specifically designed and optimised for cut-and-cover tunnel construction. With Doka CC (Cut and Cover), different types of traffic tunnel, such as rail or road tunnels, are said to be able to be built quickly, efficiently and safely. Doka says the creation of its innovative tunnel system was made possible only by the use of hi-tech construction materials and products such as the Composite formwork beam I tec 20. The choice of high-grade
  • Seeing is believing: Peri’s XR Ecosystem
    October 27, 2022
    The future of formwork is in 3-D, thanks to Peri’s XR Ecosystem, an augmented reality tool to help on-site employees with formwork assembly.
  • Mullum Mullum Valley untouched by progress
    July 20, 2012
    Preserving the unspoiled Mullum Mullum Valley was the major consideration when deciding to build a traffic tunnel The answer to one of the major issues facing construction of the A$2.5 billion EastLink route in Australia was simple: construct a tunnel. While it was expensive, those involved realised they had little option but to go underground to protect the environmentally sensitive Mullum Mullum Valley, an untouched area of wood and bushland in Melbourne. EastLink, the 39km toll road project on the easter