Skip to main content

On track with Peri’s new VCT Composite Track

By David Arminas June 19, 2025 Read time: 1 min
The VCT Composite Track system is already being used in Croatia and for construction of the new Thulba viaduct in Germany

Building steel composite bridges faster and with higher quality concrete carriageway slabs is possible with PERI’s new VCT Composite Track.

The system is already being used in Croatia and for construction of the new Thulba viaduct in Germany. Visitors will see a replica of the impressive project in the PERI exhibition hall. The composite track has also been named as a finalist for the bauma innovation award in the construction sector.

The VTC Tunnel Formwork Carriage and the SB Brace Frame facilitate shuttering and striking processes through the use of hydraulic units and can be moved automatically, which speeds up and simplifies tunnel construction processes considerably.

Peri’s portfolio for tunnel construction has been expanded to include special engineering solutions and customised special machines, which includes KERN Tunneltechnik.

For more information on companies in this article

Related Content

  • Peri’s MAXIMO Wall Formwork gets MXK bracket enhancements
    January 6, 2017
    Peri’s MAXIMO system, with its single-sided tie technology, is very much the centre for wall formwork operations. MAXIMO is the most efficient of the PERI formwork systems and has set a standard in the market for application diversity as well as a particularly high level of safety. The new MAXIMO MXK Bracket System provides maximum safety with minimum installation effort and serves as a working platform for the MAXIMO and TRIO Panel Formworks. In contrast to conventional solutions, the modular system
  • Peri UK celebrates 25 years at Rugby HQ
    October 23, 2023

    Formwork and scaffolding specialist Peri opened its depot in Rugby, northern England, in 1998 – 25 years ago. It immediately became home to a large inventory of the company’s products available for sale or hire to customers seeking safe, innovative and optimal temporary works systems for their construction projects.

  • Kwikform composite bridge formwork solution
    February 27, 2012
    Composite bridge specialist falsework, Paraslim, from RMD Kwikform is being used to construct a viaduct and rail over-bridge in Wales. Paraslim is supporting the £35 million (US$55.7 million) A487 Porthmadog, Minffordd and Tremadog Bypass constructed by a joint venture partnership of Balfour Beatty and Jones Bros Civil Engineering UK.
  • World’s largest bridge deck for KAIA expansion
    December 16, 2013
    A bespoke formwork solution from RMD Kwikform is playing a key role in creating the largest ever airport cast bridge deck as part of the multi-billion dollar expansion of King Abdulaziz International Airport near Jeddah, Saudi Arabia. The firm is also a leading player in the creation of arterial tunnels under the airport’s elevated roads, another key part of the project’s first phase works due for completion in 2014. Guy Woodford reports