Skip to main content

Towed snowplough keeps the highway clear

Pennsylvania has a new tool to keep its multi-lane highways moving this winter - a 9.14m long, tow behind snowplough. The state's transport department (PennDOT) and the Pennsylvania Turnpike Commission (PTC) say the tow plough will allow one truck to do the work of two. Costing between US$99,000- 106,000 each, PennDOT plans to have at least one tow plough in each of its 11 engineering districts by winter 2012.
April 16, 2012 Read time: 1 min
Pennsylvania has a new tool to keep its multi-lane highways moving this winter - a 9.14m long, tow behind snowplough.
 
The state's transport department (4907 PennDOT) and the 4908 Pennsylvania Turnpike Commission (PTC) say the tow plough will allow one truck to do the work of two.

Costing between US$99,000- 106,000 each, PennDOT plans to have at least one tow plough in each of its 11 engineering districts by winter 2012.

The Pennsylvania Turnpike expects to have four tow ploughs in service this winter.

Normally equipped with a 3.04m or 3.65m wide front plough, PennDOT trucks and some Turnpike trucks are equipped with a 'wing' plough attached to the side of the truck, increasing total ploughing width to about 4.8m-5.4m. A tow plough increases the ploughing width to 7.31m, allowing for two, 3.65m wide lanes to be cleared at once.

For more information on companies in this article

Related Content

  • Asphalt paving innovations coming to market
    May 24, 2019
    Asphalt paver manufacturers are introducing new models, many of which are aimed at specific market needs – Mike Woof writes A range of new asphalt paver models are coming to market, with some having been developed specifically for certain markets. China’s demand for construction equipment has resulted in numerous firms developing machines just for this market for example. Customers in China have long favoured the European-style machines, featuring tamper bar screeds, over the machines with vibrating
  • Far from formulaic
    January 4, 2013
    Formwork solutions for the first axial suspension cable stayed bridge in India; and a four-lane road bridge in Germany’s Harz Mountains, are among the latest bridge-based formwork projects analysed by Guy Woodford. RMD Kwikform India has won the contract to design and supply shoring and formwork solutions for the first axial suspension cable stayed bridge ever built in India. The Kota Bridge’s innovative design sees a single 350m span cross the entire width of the Chambal River, with three approach spans on
  • Improving a key route through Florida
    November 9, 2015
    Upgrading a key route through Florida – novel construction techniques are helping widen a road in difficult geological conditions – Lucio Garofalo reports. A major road widening project underway in Florida is due for completion soon. The work will improve an important section of road, reducing congestion at peak period and cutting travel times for drivers. The US 331/SR83 highway runs for some 79km and provides an important link in Florida’s Panhandle area, as it connects with Route 98.
  • States source funding for US highway improvements
    June 19, 2020
    States in the US have sourced Federal funding for highway improvements.