Skip to main content

Towed snowplough keeps the highway clear

Pennsylvania has a new tool to keep its multi-lane highways moving this winter - a 9.14m long, tow behind snowplough. The state's transport department (PennDOT) and the Pennsylvania Turnpike Commission (PTC) say the tow plough will allow one truck to do the work of two. Costing between US$99,000- 106,000 each, PennDOT plans to have at least one tow plough in each of its 11 engineering districts by winter 2012.
April 16, 2012 Read time: 1 min
Pennsylvania has a new tool to keep its multi-lane highways moving this winter - a 9.14m long, tow behind snowplough.
 
The state's transport department (4907 PennDOT) and the 4908 Pennsylvania Turnpike Commission (PTC) say the tow plough will allow one truck to do the work of two.

Costing between US$99,000- 106,000 each, PennDOT plans to have at least one tow plough in each of its 11 engineering districts by winter 2012.

The Pennsylvania Turnpike expects to have four tow ploughs in service this winter.

Normally equipped with a 3.04m or 3.65m wide front plough, PennDOT trucks and some Turnpike trucks are equipped with a 'wing' plough attached to the side of the truck, increasing total ploughing width to about 4.8m-5.4m. A tow plough increases the ploughing width to 7.31m, allowing for two, 3.65m wide lanes to be cleared at once.

For more information on companies in this article

Related Content

  • Mini pavers offer key performance benefits
    November 4, 2019
    Compact pavers are versatile machines that offer road repair capabilities – Mike Woof writes
  • Four Seasons Volvo CE ice-breaking wheeled loaders
    February 20, 2014
    Four Seasons Landscaping is using its fleet of Volvo construction equipment to clear away snow and ice for road using customers across the northeast US coastal state of Connecticut. Connecticut is susceptible to extreme weather – from hot and humid in the summer to snow storms in the winter and temperatures dipping below -10°C. Although it’s the third smallest American state, northern Connecticut gets twice as much snow on average compared to the south. Most snow storms usually bring 12.7cm-20.3cm but on
  • Pennsylvania $1 million grant for turnpike EV infrastructure
    April 19, 2012
    The Pennsylvania Department of Environmental Protection has announced a US$1 million grant award to help develop electric vehicle infrastructure on the Pennsylvania Turnpike. The grant recipient, Car Charging Group, will install charging stations at 17 Turnpike service plazas. Level II charging stations, which can charge a car in roughly four hours, and Level III charging stations, which can charge a car in about 20 minutes, will be installed at the service plazas in three phases. The first phase of the
  • On track for excellence in asphalt plants
    May 30, 2013
    While one leading asphalt plant company has played a key role in the creation of the new Circuit of the Americas F1 racetrack, others have been releasing new plants and plant-related technology onto the market, some of which has been exhibited at major world industry shows. Guy Woodford reports. Astec played an important role in the new Circuit of the Americas Formula 1 racetrack in Austin, Texas. The asphalt base, binder, and surface courses for the 5.47km asphalt road course, which staged its first F1 rac