Skip to main content

Tough temporary tracks from Roland

UK firm Roland Plastics says that its novel Durapath product has achieved recognition for its longevity and durability.
August 31, 2020 Read time: 2 mins
Roland Plastics is now offering the durable Durapath temporary trackway product

The firm has been working with the United Kingdom National Codification Bureau (UKNCB) to gain four Nato Stock Numbers (NSN) for the material.

This is a key development as Nato Stock Numbers (NSN) are issued after rigorous analysis and mean that products can be listed for purchase across any Nato country. This allows businesses to achieve trading relationships, in particular with the military, and other major infrastructure organisations.

The Durapath product is now being used by the Royal School of Military Engineers for a project to deploy a rapid build road surface.

The product is made from 100% recycled plastic, offers efficient drainage and can be used for motorway cnstruction sites and heavy-use car parks and factory settings.

It comes in two colours (sand and black) in 1m2 sheets and 59m2 pallets.

With its high-strength material and clipping system, Durapath can be used in heavy traffic areas with both wheeled and tracked vehicles.    

According to the firm, this is a durable product that provides a permanent ground solution, and replaces the need for traditional and costly hard-standing products. Durapath’s design conforms to the Sustainable Urban Drainage Systems Laws (SUDS) and allows water to permeate through the ground, while being strong enough to take the heaviest of day-to-day loads.

Related Content

  • Boosting the transition to a greener economy for the future
    December 8, 2020
    IRF director general, Susanna Zammataro spoke with Florent Menegaux, CEO of Michelin at the first IRF Executives Talks
  • Mexico: underwater tunnel in Latin America
    May 8, 2015
    Mexico will benefit from an important new underwater tunnel - Mauro Nogarin writes. The city of Coatzacoalcos is located at the mouth of the river of the same name, in the Gulf of Mexico, 302km from the city of Salina Cruz, Oaxaca, in the east end of trans-isthmian corridor and at the southern end of Veracruz State. The city is seeing a key development as currently construction is 85% completed on the first immersed tube, underwater tunnel in Latin America. The reasons why experts chose this type of tunne
  • Turkish customs: TAREKS taken to task
    February 29, 2024
    Turkish customs officials, under the TAREKS inspection regime, are taking a harder look at non-EU-made construction equipment. But it appears that some European manufacturers are being caught up in the importation log jam, reports David Arminas.
  • Rebuilding a historic bridge linking the US and Canada
    March 8, 2016
    While many road authorities in North America are finding it difficult to stretch their bridge assets beyond half a century, one bridge is closing in on its centenary - David Arminas reports The international Peace Bridge, connecting the Canadian province of Ontario with the US state of New York, is 88 years young this year, and still going strong.