Skip to main content

Tough temporary tracks from Roland

UK firm Roland Plastics says that its novel Durapath product has achieved recognition for its longevity and durability.
August 31, 2020 Read time: 2 mins
Roland Plastics is now offering the durable Durapath temporary trackway product

The firm has been working with the United Kingdom National Codification Bureau (UKNCB) to gain four Nato Stock Numbers (NSN) for the material.

This is a key development as Nato Stock Numbers (NSN) are issued after rigorous analysis and mean that products can be listed for purchase across any Nato country. This allows businesses to achieve trading relationships, in particular with the military, and other major infrastructure organisations.

The Durapath product is now being used by the Royal School of Military Engineers for a project to deploy a rapid build road surface.

The product is made from 100% recycled plastic, offers efficient drainage and can be used for motorway cnstruction sites and heavy-use car parks and factory settings.

It comes in two colours (sand and black) in 1m2 sheets and 59m2 pallets.

With its high-strength material and clipping system, Durapath can be used in heavy traffic areas with both wheeled and tracked vehicles.    

According to the firm, this is a durable product that provides a permanent ground solution, and replaces the need for traditional and costly hard-standing products. Durapath’s design conforms to the Sustainable Urban Drainage Systems Laws (SUDS) and allows water to permeate through the ground, while being strong enough to take the heaviest of day-to-day loads.

Related Content

  • No compromise with FAE’s STABI/H stabiliser
    May 5, 2021
    The STABI/H is FAE's top-of-the-line professional stabiliser for the construction market.
  • Florida highway rebuild project
    May 2, 2018
    Rebuilding a congested stretch of highway in Florida will cut congestion and boost safety for commuters - Mike Woof writes. Florida’s 214km-long I-4 highway provides a key transport route between Tampa and Daytona Beach, but has an unenviable reputation for both congestion and safety, with frequent delays due to heavy traffic as well as crashes. The stretch running through the city of Orlando is particularly prone to jams at peak periods, with huge traffic volumes resulting in vehicles having to slow to a c
  • Safety measures aid workzone accident reduction
    February 20, 2012
    Everyone connected with the highway industry is involved in the efforts to cut down the number of work zone accidents. Patrick Smith reports. A few months ago, as road work resumed on America's highways and bridges, US Transportation Secretary Ray LaHood called on drivers to use extra caution in work zones. At the same time he commended the success in reducing overall roadway fatalities in each of the last seven years.
  • Improving tunneling method selection
    December 11, 2015
    The tunnelling sector remains one of the most active segments of the construction industry worldwide, fuelling demand for equipment However, there have been issues with the efficiency of the selection process for the most suitable tunnelling method for a project in the past. With this in mind, the Italian hydraulic breaker manufacturer Indeco has been working on a new algorithm that allows a contractor to optimise the tunnelling method selection. The firm said that this system has been developed becau