Skip to main content

Tough covers

Innovative solutions have been developed to meet a need for long-lasting yet low cost access cover applications by Structural Science Composites (SSC). According to SSC its new products outperform rival materials in terms of safety and security as well as whole-life costs. The new composite covers meet requirements for strong covers that can cope with growing traffic densities and tough constraints on financial and operational resources for road building and maintenance. The D400 vehicular grade cover and B
February 7, 2012 Read time: 2 mins
Long life composite access covers from SSC are said to provide a good return on investment
Innovative solutions have been developed to meet a need for long-lasting yet low cost access cover applications by 2335 Structural Science Composites (SSC). According to SSC its new products outperform rival materials in terms of safety and security as well as whole-life costs.

The new composite covers meet requirements for strong covers that can cope with growing traffic densities and tough constraints on financial and operational resources for road building and maintenance. The D400 vehicular grade cover and B125 pedestrian covers come in a range of colours and provide surfaces that help boost safety.

SSC says that its new composite covers are light in weight, making them easy to place in position and are also tough enough to withstand heavy vehicle loads. Skid resistance is also said to be good, both in dry and wet conditions, unlike conventional metal or concrete covers. Metal covers pose particular hazards in the wet for cyclists and motorcyclists due to the low skid resistance. Another benefit is that the new composite covers will not be stolen for their scrap metal value, unlike conventional steel and iron units.

As the composite covers are light, this will also allow utility firms better access for routine maintenance of services and with a reduce risk of injury from heavy lifting incidents. The new covers combine the patented ThruBeam technology with reliable manufacturing processes to provide a long-lasting solution according to the firm.

The ThruBeam product has been approved for use in New York and is now available in the UK through builder's merchants. The units are offered in a choice of six coloured options and all the covers comply with the relevant European standards. Composite covers are said to be durable and light weight and are around 33% of the weight of steel and iron and 25% of the weight of concrete units. Also, being inert they will not corrode, are not electrically conductive, are fireproof and have low thermal conductivity. The life expectancy of SSC access covers is over 20 years and each carries a minimum 15 year guarantee.

For more information on companies in this article

Related Content

  • 19th century Newhall Road Bridge gets 21st century makeover
    April 10, 2018
    A Sheffield bridge with a history dating back to the 17th century has been strengthened, repaired and restored by Amey. Newhall Road bridge over the River Don is one of 240 road bridges and culverts in Sheffield to be given a new lease of life thanks to investment linked to Sheffield City’s €2.5 billion Streets Ahead highway maintenance contract.
  • Driverless vehicles -safe at any speed?
    May 22, 2018
    The development of driverless vehicles is ongoing, with manufacturers in the US, Europe, Japan, South Korea and China all working on various projects. But as the recent pedestrian fatality involving a driverless car under test in Arizona highlights, safety is not entirely assured. One key problem is that the road environment is not straightforward and self-driving vehicles have to share roadspace with vehicles under human control. However, human behaviour is not easy to predict. Nor is there one mode of beh
  • I Lift NY crane places first girder on New York’s Tappan Zee Bridge
    June 25, 2015
    One of the world’s largest cranes has placed the first steel girder assembly for the approach span of the new NY Bridge, often called the Tappen Zee Bridge in New York. The barge-mounted I Lift NY super crane with its nearly 100m boom slowly picked up the 125m unit from its delivery barge and gently lowered it onto concrete pedestals in the Hudson River, near the Rockland County side of the bridge. The super crane will install even larger sections of the new bridge, some of which weigh around 907tonne
  • Take the high road with Thomas Telford
    August 24, 2023
    Take the high road with Thomas Telford: the road builder and the poet