Skip to main content

Topcon’s LN-100 3D positioning system

Topcon Positioning Group says its new BIM solution - the LN-100 – is the world’s first 3D positioning system designed specifically for construction layout. Said to offer seamless integration and flow of project data from the design to the field, the LN-100 is simple to operate, removing “the intimidation factor and reducing the learning curve in performing construction layout tasks,” according to Eduardo Falcon, Topcon Positioning Group executive vice president and general manager for the GeoPositioning
May 13, 2014 Read time: 3 mins
342 Topcon Positioning Group says its new BIM solution - the LN-100 – is the world’s first 3D positioning system designed specifically for construction layout.

Said to offer seamless integration and flow of project data from the design to the field, the LN-100 is simple to operate, removing “the intimidation factor and reducing the learning curve in performing construction layout tasks,” according to Eduardo Falcon, Topcon Positioning Group executive vice president and general manager for the GeoPositioning Solutions Group.

Workflow is said to be simplified with the seamless integration of the LN-100 with Topcon’s MAGNET suite of software solutions.  MAGNET Field Layout and Office Layout are specifically designed and configured to meet the needs of construction layout and BIM applications.

“All that’s required to begin operation is to place the LN-100 anywhere on a project site – on a tripod, column or on the ground – and press one button. The unit self-levels and an operator just has to turn on the wireless controller and get to work,” says Falcon.

With the wireless controller, an operator can call up simple point layout or CAD drawings anywhere on a site.  “Display the design point or line that needs to be staked out, touch it, and the LN-100 laser immediately points to the exact location,” Falcon adds. The LN-100 can also lock onto a prism and guide an operator to the next design points. Its operating range allows it to cover a 200m diameter area.

The new 3D positioning system is said by Topcon to be ideal for BIM projects.  “This innovative solution utilises Topcon’s time-proven laser and robotic total station technologies to provide a highly productive system that combines design and layout operations. The Topcon family of office software and controller solutions integrates seamlessly with a wide range of Autodesk BIM software and services,” explains Falcon. “Regardless of the job – building infrastructure, electrical, plumbing, foundation and footings, walls, ceilings, HVAC, underground utilities or basic landscaping on any job site – the customer has a solution that’s easy to use without sacrificing the required accuracy and performance.”

The LN-100 is the newest of Topcon’s BIM solutions, which include the GLS-2000 laser scanner, IS series of imaging robotic stations and the DS series of standard robotic stations.

For more information on companies in this article

Related Content

  • Machine Control sector is the place for acquisitions
    January 22, 2014
    The machine control sector has been lively in recent months with a major acquisition, the unveiling of new software innovation and landmark testing of new technology to monitor paving temperature. Guy Woodford reports The state road construction authority in the German state of Saxony-Anhalt (LSBB Saxony-Anhalt) has become the first nationally to test MOBA’s new PAVE-IR Scan temperature measurement system at a works site.
  • Topcon and Bentley: integration between MAGNET 4.0 and ProjectWise
    June 7, 2016
    Topcon Positioning Group and Bentley Systems have set up direct communication between Bentley’s design applications and Topcon mobile work force products with the upcoming MAGNET 4.0 release. With the direct communication from MAGNET Enterprise to Bentley’s ProjectWise, users of Topcon’s family of MAGNET and 3D-MC software solutions can now, while working in the field, access or receive i-models created by Bentley’s OpenRoads design modeling technology. By the end of June, survey data and as-built
  • Topcon GPT-3500LN designed to measure long distances
    January 6, 2017
    Topcon Positioning Group’s latest reflectorless total station is built to go farther than ever before. “Measuring the long distance is the key new feature,” said Jan Balkema, account manager with Topcon. The GPT-3500LN is a reflectorless total station for the construction and mining market. With a measuring distance of 2000m, the GPT-3500 is designed to measure farther than any non-prism instrument in its class, Topcon said. “Incorporating the Topcon advanced time-of-flight pulse technology, the EDM is f
  • Topcon GPT-3500LN designed to measure long distances
    April 23, 2015
    Topcon Positioning Group’s latest reflectorless total station is built to go farther than ever before. “Measuring the long distance is the key new feature,” said Jan Balkema, account manager with Topcon. The GPT-3500LN is a reflectorless total station for the construction and mining market. With a measuring distance of 2000m, the GPT-3500 is designed to measure farther than any non-prism instrument in its class, Topcon said. “Incorporating the Topcon advanced time-of-flight pulse technology, the EDM is f