Skip to main content

Toads take the high road

In Scotland's capital Edinburgh baby frogs and toads have had to be cleared from a road running though a public park. Recent weather conditions have been damp yet mild and have been ideal for the amphibians to spawn, with the result that the road around Arthur's Seat has had to be closed to traffic. Park rangers have been busy removing between 400-450 of the tiny baby frogs and toads at a time and moving the amphibians to a safe location.
July 30, 2012 Read time: 1 min
In Scotland's capital Edinburgh baby frogs and toads have had to be cleared from a road running though a public park. Recent weather conditions have been damp yet mild and have been ideal for the amphibians to spawn, with the result that the road around Arthur's Seat has had to be closed to traffic. Park rangers have been busy removing between 400-450 of the tiny baby frogs and toads at a time and moving the amphibians to a safe location.

Related Content

  • Environmental solutions for tomorrow's roads
    August 2, 2012
    Leading the change, IRF organises its 2nd Conference on Roads & Environment in Geneva, Switzerland on 10-11 November 2008 An opinion poll in the UK at the end of June showed that more people think their government should first try to tackle environmental issues before trying to tackle global economic problems. Two-thirds of people were even in favour of green taxes, either now or when economic conditions improve. The environment remains high on the agenda in most countries, including in those where public o
  • It’s a blast! Road Dryer RD-1200XT
    November 28, 2018
    Traditional pavement drying typically involves the use of jet engine dryers, infrared heat and portable blowers, combined with brooms and manual squeegees. Each method has its limitations along with safety concerns. These include the use of jet fuel, noise, melting pavement, danger from thrown rocks or other objects – not mention slow results. Because of this, traffic is often fully restricted from traveling on roads or runways where drying work is taking place.
  • Tunnel stretch for safety
    June 6, 2023
    A debris tunnel stretch will provide safety.
  • Road recycling saves time and costs, reduces emissions
    February 13, 2012
    Stabilisers bring recycling improvements to roads in the UK and Armenia. The local road authorities near the UK city of Bath have saved nearly €250,500 on the cost of repairing a 400m long section of the B3110 Midford Road. This saving has been achieved by opting to recycle and strengthen in-situ the existing surface, instead of using conventional full depth pavement reconstruction.